- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文文献翻译---项目成本减少与控制详解
Ⅲ.外文翻译
外文翻译之一
Project Budget Monitor and Control
Author:Yin Guo-li
Nationality:American
Derivation: Management Science and Engineering. Montreal: Mar 20, 2010
.
With the marketing competitiveness growing, it is more and more critical in budget control of each project. This paper discusses that in the construction phase, how can a project manager be successful in budget control. There are many methods discussed in this paper, it reveals that to be successful, the project manager must concern all this methods.
1. INTRODUCTION
The survey shows that most projects encounter cost over-runs (Williams Ackermann, Eden, 2002,pl92). According to Wright (1997)s research, a good rule of thumb is to add a minimum of 50% to the first estimate of the budget (Gardiner and Stewart, 1998, p251). It indicates that project is very complex and full of challenge. Many unexpected issues will lead the project cost over-runs. Therefore, many technologies and methods are developed for successful monitoring and control to lead the project to success. In this article, we will discuss in the construction phase, how can a project manager to be successful budget control.
2. THE CONCEPT AND THE PURPOSE OF PROJECT CONTROL AND MONITOR
Erel and Raz (2000) state that the project control cycle consists of measuring the status of the project, comparing to the plan, analysis of the deviations, and implementing any appropriate corrective actions. When a project reach the construction phase, monitor and control is critical to deliver the project success. Project monitoring exists to establish the need to take corrective action, whilst there is still time to take action. Through monitoring the activities, the project team can analyze the deviations and decide what to do and actually do it. The purpose of monitor and control is to support the implementation of corrective actions, ensure projects stay on target or get project back on target once it has gone off target。
3. SETTING UP AN EFFICIENT CONTROL SYST
您可能关注的文档
- 基于PLC控制的气动机械手的设计毕业论文精选文档.doc
- 基于数据库的在线答疑系统开发设计-大学毕业论文毕业设计学位论文范文模板参考资料详解.doc
- 基于网络平台的信息技术学习评价推荐.ppt
- 基层主管的职责定位精品.ppt
- 基层主管的职责定位推荐.ppt
- 基层党建工作制度汇编3045979详解.doc
- 基于膨胀机理的钢渣基层材料体积安定性研究详解.docx
- 基层党建工作制度汇编34935详解.doc
- 基于单片机的步进电机控制系统设计论文(C语言)详解.doc
- 基层党建工作制度汇编35474详解.doc
- 备战2013开门红主顾开拓推荐.ppt
- 外研小学起点版八年级上册英语语法复习推荐.ppt
- 外研版九年级英语上册各模块测试题及答案【精品 全套】详解.doc
- 外研版六年级英语下册全册教案详解.doc
- 基本护理 第16章 危重病人的精品.ppt
- 外研版小学英语三年级上册Module4 Colours Unit1 It’s red 课件精品.ppt
- 外研版九年级英语下册全册教案详解.doc
- 外研版小学英语五年级上册Module9 Unit1 Are you feeling sad课件1精品.ppt
- 外研版小学二年级英语上册Module9课件ppt精品.ppt
- 外研版小学二年级英语上册Module9精品.ppt
文档评论(0)