日处理量为80万ta的黄沙坪铅锌选矿厂设计 采矿工程专业毕业设计 毕业论文精品
摘 要
根据任务书要求,本次设计任务为日处理量为80万t/a的黄沙坪铅锌选矿厂,产品为铅精矿、锌精矿。
设计详细介绍了黄沙坪选矿厂的基本情况和矿石的性质,确定了车间工作制度,进行了流程选择计与论证。最终确定采用三段一闭路破碎流程,磨矿采用一段闭路流程,选别采用部分等可浮浮选流程,精矿采用二段脱水流程。接着对破碎、筛分、磨矿、分级、选别、浓缩和过滤等作业进行流程计算和设备选择与计算,并对其设备选择进行方案比较。根据选矿厂的地形条件,厂房总体布置采用阶梯式配置,粗碎和中细碎厂房分厂房配置,检查筛分厂房独立配置,磨矿与浮选车间共厂房配置,浓缩与过滤车间分开配置,浓缩采用露天配置。
本设计绘制了破碎、筛分、磨浮、脱水车间平断面图;设备联系图;数质量矿浆流程图共9 张。
关键词:选矿厂设计,铅锌矿,部分等可浮流程
Abstract
By following the assignment,my work is to design an 90t/a lead-zinc concentrators with lead concentrate and zinc concentrate as it `s products.
Firstly,I choose the address of the concentrators and then introduce the basic condition of Huang Sha Ping lead-zinc concentrators and .I choose and demonstrate the process after confirming the workshop’s system.So,the process of crushing is three sections with one closed circuit;the grinding take the one section closed process.Ore dressing takes process of partly selective flotation in the lead-zinc separation.Dewatering takes two sections circuit with concentrate and filter.The crushing,screening,grinding,classification,oredressing,
concentration and filter are calculated.Comparing to several different programs,the minneral processing equipments are confirmed lastly.According to the topography of Huang Sha Ping,workshops are arranged step by step.Rough crushing is arranged in a unique workshop separated form the mid and fine crushing.Checking screening workshop is unique too. There are ten design drawings contained in my work include the tabulate and sectional drawings of crushing,grinding,dewatering;the connection of equipment etc.Furthermore there is one drawing maken by hand and the others are drawed by computer with AutoCAD.
Keywords: mineral processing plant design; lead and zinc ores;partly selective flotation
目 录
摘 要 I
Abstract II
目 录 III
第一章 绪论 1
1.1 矿山概况 1
1.2 选厂厂址基本特点 2
1.3 矿床和原矿性质 4
1.4 采矿基本情况 7
1.5 产品方案和销售 8
第二章 设计流程选择与论证 9
2.1 破碎流程的论证及选择 9
2.2 磨矿流程的论证及选择 9
2.3 选别流程的论证及选择 11
2.4 脱水流程的论证及选择 15
2.5选厂工作制