Analysis of engineering changes and claims in construction enterprises(建筑施工企业工程变更及索赔对策分析).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Analysis of engineering changes and claims in construction enterprises(建筑施工企业工程变更及索赔对策分析)
Analysis of engineering changes and claims in construction enterprises(建筑施工企业工程变更及索赔对策分析)
Abstract: due to the change of claim is an important part of contract management, and also the power of project management is an important means of recovering the cost of the loss, so with the development and perfection of the construction market, it will become more and more important in project management. The following are the current changes, claims, problems and countermeasures should be taken to explore.
Key words: change; claim; reason; countermeasure
Due to the project itself and many objective factors of variability in the project implementation process, will often lead to design changes (such as changes and technical standards of engineering and project change), or because of external environment variation and construction measures of changes, sudden events of force majeure, the contract and non contract management disorder responsibility, increased costs and other issues for the completion of the contract must be. Therefore, in the process of implementation of the project contract, changes and claims are inevitable, and often accompanied by changes in claims. Therefore, it is of great significance to make a comprehensive analysis of the engineering change claim line and study its preventive measures.
I. reasons for changing claims
The reasons for the change of claim are mainly manifested in the following 5 aspects.
1. design defect factors
During the construction stage, the design defects or geological conditions are different from the actual ones, which leads to the claim of the construction period, the manpower and the material.
2. construction contract is not perfect
In the construction process, the two sides signed the construction contract, and clearly failed to fully consider the impact of various factors on the engineering construction, the construction contract, such as the emergence of the contradictions in the performance, causing the construction claim.
3.
您可能关注的文档
- 六年级数学人教版六年级下册《整理与复习-数学思考》ppt.ppt
- 山东卫生 继续医学教育《社区护理》试题答案..doc
- (新教科版)八年级道德与法治上册教案:4.2关涉全人类的公共利益.doc
- (秋)《建筑结构检测与鉴定》考试作业.doc
- --企业会计准则第9号——职工薪酬试题及答案.doc
- --学年第二学期初中教导处工作计划.docx
- --度子良乡中心学校工作计划.doc
- --度学校工作计划.doc
- -2018年最新审定新人教版六年级语文小学六年级语文上册第六单元测试题.doc
- -2018年我国非晶合金变压器行业市场趋势及前景分析报告.doc
- 9月新广告法.doc
- AWS CWI Part A 焊接检验工艺学 练习题.docx
- AZ31合金板料在深冲压中的变形 材料成型及控制工程专业毕业设计外文翻译.doc
- BB建材市场业务员管理制度-员工奖罚实施细则.doc
- betterzip3.1.2注册码 3.1.2 商贸行业:XXX化妆品连锁有限公司事故应急预案.doc
- Business Justification Outline & Considerations文档.doc
- CA6140车床拨叉831002加工工艺及铣拨叉口φ82两侧面夹具设计【包含全套CAD图纸】 .pdf.pdf
- CCTV的“储备能源库”——中央电视台中国广播电视音像资料馆磁带库系统建设侧记.doc
- cd4 cd25 调节性t细胞与自身免疫性肝病研究进展_临床医学论文.doc
- Case-平衡记分卡应用案例.doc
原创力文档


文档评论(0)