定子冷却水冲洗方案.docVIP

  • 4
  • 0
  • 约1.48万字
  • 约 13页
  • 2018-03-30 发布于广东
  • 举报
Specification for GG-work instruction, flushing stator cooling water system, standard module Table of contents: 1 General 4 1.1 Definitions 4 1.2 Foreseen application and purpose 4 1.3 Categories and criticality 4 2 Material properties requirements 4 3 Form, fit and function requirements 4 4 Testing and verification requirements 4 5 Process requirements 5 5.1 Specific process requirements 5 6 Associated standards 9 7 Transportation and logistic requirements 10 7.1 Delivery requirements 10 8 Notes 10 8.1 Identification of changes 10 9 Appendices 11 9.1 Check lists 11 9.2 Arrangement

文档评论(0)

1亿VIP精品文档

相关文档