网站大量收购独家精品文档,联系QQ:2885784924

毕业论文--TBM在不良地质条件下的隧道掘进(含外文翻译)_精品.doc

毕业论文--TBM在不良地质条件下的隧道掘进(含外文翻译)_精品.doc

  1. 1、本文档共36页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业论文--TBM在不良地质条件下的隧道掘进(含外文翻译)_精品

毕业论文--TBM在不良地质条件下的隧道掘进(含外文翻译) ABSTRACT 摘要 This paper is to discuss TBM tunneling in difficult ground conditions when problems are met which may reduce dramatically the average progress rates and practical consequences may be such as to pose serious questions on the use of mechanized TBM tunnelling versus drill blast and other so-called traditional excavation methods Following a few remarks on rock TBM tunnelling in relation to the selection and dimensioning of the machine the attention is posed on the limiting geological conditions which may be envisaged with respect to the use of TBM tunnelling and on the importance of geological and geotechnical investigations in order to derive an appropriate understanding of the rock mass conditions along the line of the tunnel The discussion is centered upon the relatively more important or difficult ground conditions including borability limits instability of excavation walls instability of excavation face fault zones and squeezing Whenever available to the authors and based on project experience the point of view is illustrated by case examples which give the opportunity to underline specific difficulties encountered and recommendations 本篇论文所探讨的内容是在遇到严重减小掘进速度的不良地质条件下的隧道开挖并提出采用TBM钻爆法和其他所谓的传统开挖方法进行隧道掘进时所能遇到的问题下面是由TBM进行掘进的有关机器选型和尺寸的说明关注于使用TBM进行掘进的地质条件的限制及地质和地质观测的重要性所以要恰当理解隧道沿线的围岩状况讨论集中于相对重要或不良地质状况的围岩其中包括可挖性限制开挖洞壁的不稳定性开挖掌子面的不稳定性断层和挤压岩况利用其他作者之言并基于工程经验通过实例阐述观点借此机会强调面临的特殊困难并给出建议 INTRODUCTION 引言 TBM excavation represent a big investment in an unflexible but potentially very fast method of excavating and supporting a rock tunnel Barton 1996 When unfavorable conditions are encountered without warning time schedule and practical consequences are often far greater in a TBM driven tunnel than in a drill and blast tunnel TBM开挖不仅意味着巨额投资而且可以进行快速开挖和支护 Barton 1996 .在无预警的情况下遇到不良地质条件从时间和实际产生的结果来讲采用TBM 方法进行隧道掘进远远比采用钻爆法快得多 The unfavorable conditions can be produced by either a rock mass of very poor quality causi

文档评论(0)

seunk + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档