网站大量收购独家精品文档,联系QQ:2885784924

Examples of Engineering Scaling Preserving temperature profile 工程尺度的保存温度剖面的例子.ppt

Examples of Engineering Scaling Preserving temperature profile 工程尺度的保存温度剖面的例子.ppt

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Examples of Engineering Scaling Preserving temperature profile 工程尺度的保存温度剖面的例子.ppt

Comments on feasible testing program and potential limits of ITER parameters for TBM testing Presented at TBWG-11 Meeting Garching, Germany October 22, 2003 Purpose of Presentation This presentation has been prepared in response to a request from TBWG Chair, Dr. L. Giancarli, to summarize the experience gained during the last 20 years on how to plan useful blanket tests in the fusion environment. In particular: Blanket Testing Issues Engineering Scaling considerations for design of “Act-Alike” test articles Requirements on fusion testing device parameters Usefulness and LIMITATIONS of current ITER Design for blanket testing Note that there is considerable information available in literature based on scholarly and engineering research efforts in INTOR, FINESSE, ITER-CDA, ITER-EDA, VNS (IEA-HVPNS). See list of journal papers and reports. Key Points We Learned about the Blanket Test Program Blanket/First Wall has serious, yet unresolved feasibility issues. Non-fusion facilities can not fully resolve any of the critical issues for blankets or PFC’s There are critical issues for which no significant information can be obtained from testing in non-fusion facilities (examples include the identification and characterization of failure modes, effects and rates) The feasibility of Blanket/PFC Concepts can NOT be established prior to testing in fusion facilities The purpose of testing in fusion testing facilities such as ITER is to obtain data on the feasibility and performance limits of blanket concepts for DEMO and Reactors. Since these are the “first” tests in the “fusion environment,” they are aimed at investigating feasibility and performance limits of various concepts, configurations, material combinations, etc. They are NOT, and Can Not be, merely “Confirmation” Tests Key Points We Learned About the Blanket Test Program (cont’d) Since ITER testing parameters (e.g., wall load, surface heat flux, plasma duty cycle, etc.) are substantially below those of DEMO, SERIO

您可能关注的文档

文档评论(0)

cai + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档