EPA’s Underground Injection Control Program:EPA的地下喷射控制程序.pptVIP

EPA’s Underground Injection Control Program:EPA的地下喷射控制程序.ppt

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
EPA’s Underground Injection Control Program:EPA的地下喷射控制程序.ppt

EPA’s Underground Injection Control Program Brine Disposal Well Regulation in Pennsylvania Stephen Platt, UIC National Expert UIC Program History Regulations authorized under the Safe Drinking Water Act National concerns regarding unregulated injection Protects USDWs from all types of injection UIC program regulations promulgated in July, 1980 EPA begins direct implementation of the Pennsylvania program June, 1985 UIC Well Classification Class I – Industrial and Municipal (including hazardous waste) Class II – Oil and Gas (including enhanced recovery and brine disposal) Class III – Mining related (e.g. salt solution mining) Class IV – Shallow hazardous waste injection, banned Class V – All other wells EPA UIC Permitting Mandate to protect underground sources of drinking water (USDWs) USDWS defined as having less than 10,000 mg/l Total Dissolved Solids Current and future use protected Permitting is performance based Hydraulic fracturing not regulated under UIC Program EPA UIC Permitting (cont.) Major Permitting requirements: Defining Area of Review/Zone of Endangering Influence Injection well construction (Depth of surface casing critical) Well operation (Maximum Injection Pressure and Injection Rates critical) Mechanical integrity testing Plugging and abandonment Financial Responsibility Area of Review Permit Issuance Process No application fee One stop shopping: Permit issued for construction, operation, monitoring and reporting Processing generally takes between 3-6 months Public notification and opportunity for public hearing required. Brine Disposal in Pennsylvania Facility Name County Injection Formation Injection Pressure Injection Volume (Bbls/M) Columbia Gas Beaver Huntersville/Oriskany 1300 21,000 EXCO-North Coast Clearfield Oriskany 3240 4260 CNX Gas Green

文档评论(0)

cai + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档