- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
题库642-681
1. The CiscoWorks Wireless LAN Solution Engine uses which protocol for radio management?
A. CCKM
B. LWAPP
C. SNMP
D. WLCCP
Answer: D
2. Which two key features are unique to the controller-based feature set? (Choose two.)
A. fast secure roaming
B. rogue access point detection
C. access point participation in RF management
D. access point registration via digital certificate
E. dynamic RF control without a dedicated management platform
Answer: DE
3. The Newton manufacturing company has three facilities that are located in Columbia, South Carolina.
The corporate office is located in an 11-story building downtown. The RD facility is located on the north
side of the city approximately 4 miles (6.4 km) from the corporate office in a five-story building. The
manufacturing facility is located approximately 6 miles (9.6 km) to the northwest of the corporate office. Line
of sight exists from the downtown office to all facilities. Users at the manufacturing plant require network
connectivity for file sharing and e-mail, while the users at the RD facility require high-speed Internet
access with the ability to send large CAD drawings to the corporate office and large machine control files to
the manufacturing facility. Presently, the manufacturing facility is connected to the corporate office by a
64-kbps leased line, and the RD facility is connected to both the corporate office and the manufacturing
facility by a dedicated T1 line. The company plans to add a second line of development at the RD facility
within the next 60 days. The current T1 lines are at a constant 70-percent utilization rate. The current
projected lead time for installation of additional lines is 90 days if the current cable plant will support it.
A wireless bridging solution would provide which three benefits to the customer? (Choose three.)
A. rapid deployment
B. immunity to weather
C. increased bandwidth
D. guaranteed bandwidth
E. increased security
F. lower total cost of ownership
Answer: ACF
4. In a mesh
您可能关注的文档
最近下载
- 城市轨道交通AFC系统65课件.pptx VIP
- 2025年云南省交通投资建设集团有限公司校园招聘笔试备考题库及答案解析.docx VIP
- 建筑工地基孔肯雅热防控和应急方案.docx VIP
- 第3章 知觉和模式识别.ppt VIP
- 公开课饮酒其五省公开课一等奖全国示范课微课金奖课件.pptx VIP
- 第二单元 6~10的认识和加、减法 单元教学设计 2025人教版数学一年级上册.pdf
- 钢筋混凝土管管道吊装方案.doc VIP
- 中医操作评分标准.pdf VIP
- 5.1 探究过氧化钠与二氧化硫的反应 课件 高一下学期化学人教版(2019)必修第二册.pptx VIP
- 农广校说课大赛.pptx VIP
文档评论(0)