otis双层轿厢高速梯大夏.pdfVIP

  • 5
  • 0
  • 约1.68万字
  • 约 6页
  • 2018-04-30 发布于河北
  • 举报
otis双层轿厢高速梯大夏.pdf

Double-Deck Projects Year Building Name, Location Elevator Group Completion Under Sydney Tower 1 group with 3 d/d elevators construction 3 – 900/900 kg @ 7.0 mps Under Burj Dubai 1 group with 2 d/d elevators construction U.A.E 2 – 1600/1600 kg @ 10.0 mps Under McCarthur Tower 1 group with 1 d/d elevators construction Australia 1 – 1360/1360 kg @ 7.0 mps Under Shanghai World Financial Center 9 groups with 22 d/d elevators construction China 8 – 1350/1350 kg @ 3.5 mps 10 – 1350/1350 kg @ 6.0 mps 1 – 2175/2175 kg @ 8.0 mps 1 – 2175/2175 kg @ 7.0 mps 2 – 1800/1800 kg @ 6.0 mps Under Beijing Silvertie Center 4 groups with 24 d/d elevators construction 12 – 1350/1350 kg @ 3.5 mps 12 – 1350/1350 kg @ 6.0 mps 2003 NTUC Center 1 group with 6 d/d elevators Singapore 6 – 1600/1600 kg @ 6.0 mps 2003 Raffles Square 2 groups with 12 d/d elevators China 6 –

文档评论(0)

1亿VIP精品文档

相关文档