施工技术-散水施工工艺(Construction technology - water - dispersed construction technology)
Process of bulk water construction
A,? Construction preparation
(I) working conditions
1,? ????? The wall decoration has been basically completed, the outer scaffolding has been removed, the water base elevation, the dimension has been inspected, and has been completed, the procedure of the advance inspection.
2.? ????? The scattered water should be divided into pieces, and the length of the block should not be bigger than 6m. The remaining seam should consider the overall effect of the building.
3,? ????? Peg the horizontal piles according to the elevation line.
4,? ????? Check the mix ratio of the concrete, check the backstage scale, and carry out the opening at the end of the opening. The strength of the concrete is not less than C15.
5,? ????? The size of bulk water should be according to the design drawing, the width of the general gray soil cushion shall not be less than 800mm, the thickness of the thickness shall not be less than 150mm, and the width of concrete shall not be less than 600mm. The thickness is not less than 50mm.
(2) material requirements
1,? ?? ? Soil: appropriate use priority base slot to dig in the soil, or similar soil clay, loam, must not contain any organic impurities, before using appropriate sieving, its size is not more than 15 mm, water content is 12% ~ 15% (feel can knead dough, light break away).
2.? ????? Lime: the application of ash or lime powder can be thoroughly cooked before use. It should not contain unripe lime blocks, and its particle size is not greater than 5mm, and it should not contain excessive moisture.
3,? ????? Cement, appropriate is used more than 32.5 on the Richter scale and its silicate slag Portland cement, Portland, or, appropriate chooses the same cement production factory with varieties at the same time, with the concrete strength grade, the same factory number.
4,? ????? Sand: medium sand or coarse sand, less than 3 %.
5,? ????
您可能关注的文档
- 拆迁服务手册[精品].doc
- 拒绝白色污染[精品].ppt
- 招商引资优惠政策哈尔滨市招商引资优惠政策[精品].doc
- 招商引资优惠政策:哈尔滨市招商引资优惠政策[精品].doc
- 招商银行营销话术[精品].doc
- 招标文件范本20110601济南市建设工程招标投标管理办公室[精品].doc
- 拨打陌拜电话十一大步骤[精品].doc
- 指静脉识别技术在门禁系统中的应用[精品].doc
- 授权合作协议书[精品].doc
- 探析促进农村小学生日常行为习惯养成的有效性途径[精品].doc
- 施工单位项目经理质量责任书[精品].docx
- 施工技术-散水施工工艺(Theconstructiontechnologyofwater-ConstructionTechnology)[精品].doc
- 施工总承包与相关单位的协调措施[精品].doc
- 施工现场临时用电安全协议书[精品].doc
- 施工现场临时道路混凝土硬化施工方案[精品].doc
- 施工现场消防安全保障方案[精品].doc
- 施工现场监理工作管理制度[精品].docx
- 施工现场高处坠落事故应急救援预案[精品].doc
- 施工组织设计项目管理班子的人员岗位职责[精品].doc
- 施工阶段工程造价控制的措施以及施工组织设计的优化[精品].doc
最近下载
- 2025年SECon大会-AI原生应用架构专场分享材料 AI网关:AI原生架构下的智能流量中枢-阿里云.pdf VIP
- 伟创310变频器说明书电子版.pdf
- 2019年吉林银行服务规范知识测评.docx VIP
- 2025网关的演进在AI原生架构实践.pptx VIP
- 三年级语文上册课外阅读理解.docx VIP
- 2025年AI+Agent通信网关技术研究报告.pdf VIP
- 安全是企业生命质量是企业的生命安全是.docx VIP
- AI 时代的“智能流量中枢”,AI 网关搭建与落地.pdf VIP
- 2026年科研实验室技术人员专业能力测试题目集.docx VIP
- YBT 153-2015 优质结构钢连铸坯低倍组织缺陷评级图.docx
原创力文档

文档评论(0)