无粘结预应力混凝土平板开洞技术(Opening technology of unbonded prestressed concrete slabs)精选.doc

无粘结预应力混凝土平板开洞技术(Opening technology of unbonded prestressed concrete slabs)精选.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
无粘结预应力混凝土平板开洞技术(Opening technology of unbonded prestressed concrete slabs)精选

无粘结预应力混凝土平板开洞技术(Opening technology of unbonded prestressed concrete slabs) [Abstract] because of the high requirement, the Linghai L and 2 story hall two-way unbonded prestressed concrete roof is completely removed along the sides of the surrounding beam, and the opening is 8m * 7.45m, because of the high requirement of the use of the Beijing industrial and agricultural products exhibition hall. In this paper, the method of opening is expounded in detail from the setting up of slab bottom support system, the elimination of concrete slab, the cutting and releasing of prestressing tendon, the reinforcement of Zhang La end surface and re stretching. Keywords opening project; unbonded prestressed concrete slab; removal of prestressing tendon; reinforcement; Industrial and agricultural products of Beijing city new Fengtai District Linghai agribusiness joint company showroom project has a total construction area of 2 44561.87m, divided into A, B two. The A building area of 40124.87m2, underground l layer, the ground layer 3, the standard storey is 4.2m floor with unbonded prestressed concrete flat beam and plate structure, with the size of 9000mm * 9900mm, 9900mm * 9900mm, Liang Kuan 1000, 1200mm flat two, high of 500mm, thickness of 200mm plate unbonded prestressed steel strand for two-way curve layout. 1 openings Engineering Overview The main structure of this project, unbonded prestressed concrete flat beam and slab construction, was completed in 1998, l and February. L in early 999, the construction unit in the approval of the view that the entrance height is too low, so the requirements will be 1, 2, 1 / A - B, l, 2, a L 3 axis between the unbonded prestressed concrete roof removal. That is to be in the 9000mm * 8100mm column in 3, along the road of unbonded prestressed concrete flat beam and 1 non prestressed concrete edge beam edge of unbonded prestressed concrete flat roof will be deleted, and related parts of the recovery and elimination of prestress, the size of

您可能关注的文档

文档评论(0)

bodkd + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档