钢筋混凝土简支T梁桥毕业设计精选.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢筋混凝土简支T梁桥毕业设计精选

摘 要 Abstract This bridge is the construction of T type girder which is assembly reinforcing steel bar the simple pore span is 18m , two spans in total, the main girder is 1.4m, which adopt the C30 concrete , the common reinforcing steel bar adopt HRB335、R235level reinforcing steel bar. Width of the Bridge is net- 7m + 2 × 1.0 m sidewalks. Jidong County of Muling River Bridge Project in Heilongjiang province is the Twelfth Five-Year Plan key construction projects. Is connected to Mishan port and domestic provinces to Russia s main channel.In accordance with the bridge design basic principle: advanced technology, safe and reliable,comfortable and durable, economical and reasonable, beautiful and friendly to carefully design. Work out the girder being in progress to stride over the footpath and the cross section dimension based by given fundamental data .Calculate the character of girder cross section and the internal force that is be produced by dead load and live load. Combination the carry ability of limit state of internal force, also we must combination the limit state of internal force for normal use. Calculate and checking computation construction assembly of girder according to disadvantageous data produced by these combination.Woke out the dimension of substructure, calculate the internal force.Besides, we must carry out the calculate and construction assembly the roadway’s board and internal force of transverse septa beam. Through this design, so that we basically have the T type bridge design process, learned how to gather information, increased my analysis and problem-solving ability. Keywords Construction assembly Combination of Internal force Construction assembly Load Construction of T type girde Moment 目 录 摘 要 I Abstract II 第1章 绪论 1 1.1设计选题前提 1 1.2方案比选 11.2.1装配式钢筋混凝土简支T梁桥 2 .2.2梁拱组合体系桥 2 1.3设计内容和方法 3 1.4设计意义 4 第2章 桥梁上部结构尺寸的拟定 5 2.1主梁截面尺寸拟定 5 2.1.1主梁高 5 2.1.2主梁间距 5 2.1.3主梁梁肋宽 5 2.1.4翼缘板尺寸 5 2.2桥面铺装 6 第3章 主梁内力计算计

文档评论(0)

bodkd + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档