前 言
中文摘要
沙溪口水电站计划建在福建省南平市上游的西溪上,是闽江流域的一个梯级电站,属于河床式水电站。本电站主要组成建筑物有溢流坝、非溢流坝、厂房和船闸。坝体型式为混凝土重力坝,溢流坝段布置于河床中部,厂房布置在河床右岸,船闸布置在左岸。
非溢流坝坝顶高程91.5m,上游面坡度为1:0.2,下游面坡度1:0.80,溢流坝堰顶高程77.62m。溢流坝段全长320m,设有16孔溢流孔,每孔净宽取为17.0 m,沿主河槽宣泄绝大部分洪水。
水库正常蓄水位为85.50m,设计洪水位为88.00m,校核洪水位为88.50m,死水位为82.00m。电站设计水头为16.44 m,总装机容量为300MW,安装有4台轴流式水轮发电机组,每台装机容量为7.5MW。水轮机型号均为ZZ560-LH-850,转轮直径为8.5m,水轮机安装高程66.10m,发电机层高程82.00m,取安装场高程与发电机层同高。下游校核洪水位81.00m,主厂房顶高程为103.00 m,厂房总长156.5m,宽77.0m。220kV及110kV开关站布置在尾水平台右侧。
船闸闸室100m×12.5m×2.5m(长×宽×最小水深),位于溢流坝左侧。
沙溪口水电站具备发电,航运,过木等的综合效益,是福建电网的骨干电厂。
关键词
沙溪口水电站、河床式厂房、重力坝、溢流坝、水轮机、发电机、抗滑稳定性、扬压力、轴流式水轮机、发电机层结构设计
Abstract
Shaxikou Hydropower Station is prepared to built at Xixi stream, upstream the city of Nanping in Fujian Province. It is one of the cascade development in the Minjiang river basin. It is a powerhouse in river channel.
The main structures of Shaxikou Hydropower Station is consist of overflow spillway dam, non-overflow spillway dam, powerhouse and lock. The dams are concrete gravity dams. The overflow spillway dam lies in the centre of the riverbed. The powerhouse lies on the right, and the lock is located on the left.
The top of the non-spillway dam is at an elevation of 91.50 meters. The upstream of the dam is vertical, the lower slope degree is 1:0.2,and the upper slope degree is 1:0.80. the crest of the weir is at an elevation of 77.26 meters. The overflow spillway dam is about 320 meters long in total, with 16 openings each of 17 meters wide, discharging most of the flood flow along the main river channel.
The normal water lever of the reservoir is 85.50 meters,while the design flood water level of the reservoir reaches at 88.00 meters. The checking flood water level is about 88.50 meters. And the dead water level is only 82.00 meters.
The design cross-head is 16.44 meters. The project has a total installed capacity of 300MW. It houses four axial-flow turbines coupled with generators 75MW each. The type of the turbine is ZZ560-LH-850. The diameter of the turbi
您可能关注的文档
- [七年级下册语文练习册答案人教版]鄂教版七年级语文下册第12课《芦花荡》作业练习.doc
- 2018全国教师招聘考试【教育综合知识】(中学)全新模拟试卷(共8套)(含答案).doc
- 世说新语两则中考题-世说新语中的文言文.doc
- 二年(下)数学(64节).doc
- 带转换层结构的自振特性模态分析.doc
- 公租房收入证明模板(文档13篇).doc
- SOD活性测定POD活性测定CAT活性测定质膜透性测定MDA含量测定色素含量测定实验方案及数据记录表格.doc
- 某3层框架教学楼全套设计建筑图结构图计算书施工组织设计-结构计算书【可提供完整设计图纸】.doc
- 工业固体废物收集与处置项目(含危险废物)补充环评报告.doc
- 诸暨人民医院总承包施工组织设计.doc
文档评论(0)