沙溪口水电站设计及发电机层楼板设计说明书.doc

沙溪口水电站设计及发电机层楼板设计说明书.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
沙溪口水电站设计及发电机层楼板设计说明书.doc

前 言 中文摘要 沙溪口水电站计划建在福建省南平市上游的西溪上,是闽江流域的一个梯级电站,属于河床式水电站。本电站主要组成建筑物有溢流坝、非溢流坝、厂房和船闸。坝体型式为混凝土重力坝,溢流坝段布置于河床中部,厂房布置在河床右岸,船闸布置在左岸。 非溢流坝坝顶高程91.5m,上游面坡度为1:0.2,下游面坡度1:0.80,溢流坝堰顶高程77.62m。溢流坝段全长320m,设有16孔溢流孔,每孔净宽取为17.0 m,沿主河槽宣泄绝大部分洪水。 水库正常蓄水位为85.50m,设计洪水位为88.00m,校核洪水位为88.50m,死水位为82.00m。电站设计水头为16.44 m,总装机容量为300MW,安装有4台轴流式水轮发电机组,每台装机容量为7.5MW。水轮机型号均为ZZ560-LH-850,转轮直径为8.5m,水轮机安装高程66.10m,发电机层高程82.00m,取安装场高程与发电机层同高。下游校核洪水位81.00m,主厂房顶高程为103.00 m,厂房总长156.5m,宽77.0m。220kV及110kV开关站布置在尾水平台右侧。 船闸闸室100m×12.5m×2.5m(长×宽×最小水深),位于溢流坝左侧。 沙溪口水电站具备发电,航运,过木等的综合效益,是福建电网的骨干电厂。 关键词 沙溪口水电站、河床式厂房、重力坝、溢流坝、水轮机、发电机、抗滑稳定性、扬压力、轴流式水轮机、发电机层结构设计 Abstract Shaxikou Hydropower Station is prepared to built at Xixi stream, upstream the city of Nanping in Fujian Province. It is one of the cascade development in the Minjiang river basin. It is a powerhouse in river channel. The main structures of Shaxikou Hydropower Station is consist of overflow spillway dam, non-overflow spillway dam, powerhouse and lock. The dams are concrete gravity dams. The overflow spillway dam lies in the centre of the riverbed. The powerhouse lies on the right, and the lock is located on the left. The top of the non-spillway dam is at an elevation of 91.50 meters. The upstream of the dam is vertical, the lower slope degree is 1:0.2,and the upper slope degree is 1:0.80. the crest of the weir is at an elevation of 77.26 meters. The overflow spillway dam is about 320 meters long in total, with 16 openings each of 17 meters wide, discharging most of the flood flow along the main river channel. The normal water lever of the reservoir is 85.50 meters,while the design flood water level of the reservoir reaches at 88.00 meters. The checking flood water level is about 88.50 meters. And the dead water level is only 82.00 meters. The design cross-head is 16.44 meters. The project has a total installed capacity of 300MW. It houses four axial-flow turbines coupled with generators 75MW each. The type of the turbine is ZZ560-LH-850. The diameter of the turbi

您可能关注的文档

文档评论(0)

cai + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档