build_application1建 造 入 级 船 舶 审 图 检 验 申 请.docVIP

  • 1
  • 0
  • 约1.35万字
  • 约 8页
  • 2018-05-18 发布于江苏
  • 举报

build_application1建 造 入 级 船 舶 审 图 检 验 申 请.doc

build_application1建 造 入 级 船 舶 审 图 检 验 申 请

中 国 船 级 社 CHINA CLASSIFICATION SOCIETY 建 造 入 级 船 舶 审 图 / 检 验 申 请 APPLICATION FOR NEWBUILDING SHIPS SERVICES 兹申请中国船级社对下述船舶进行 We hereby apply China Classification Society to carry out the following services for the vessel mentioned below: 船级图纸审批 Plan Approval for Classification 建造中入级检验 Classification Survey during Construction 法定图纸审批 Plan Approval for Statutory Requirements 建造中法定检验 Statutory Survey during Construction 建造厂/Builder 联系人/电话/传真 Contact/Tel No/Fax No 设计单位/Designer 联系人/电话/传真 Contact/Tel No/Fax No 预期船东/船舶营运人 Prospective Owner/Operator 船旗 Flag 船籍港 Port of Register 船型 Type of Ship 船长Length(Overall) 船(两柱间)长 Length(B.P.) . 型宽 Breadth(Mld.) 设计吃水 Draft designed 型深 Depth(Mld.) 1969总吨位(预估)/1969 Gross tonnage(Approx.) 载重吨 Deadweight 载运集装箱量(TEU)/Capacity of carrying containers (TEU) 载客量/Capacity of carrying passengers 船舶航区/专用航线 Service Area/Special Route 冰区加强 Ice Class 申请授予的船级符号和附加标志 Class Characters and Class Notations: ★ CSA ★ CSM 船舶或系列船舶A (单一建造合同、没有选择权船舶) Ship or series ships (a single contract without optional ship) 船名/船舶编号 Ship Name/ Hull No. 合同中其余船 舶的船舶编号 Hull No. of the other ships in the same contract 建造合同签署日期 Date of contract for construction 船舶或系列船舶B (具有选择权船舶的单一建造合同) Ship or series ships (a single contract with optional ships) 船名/船舶编号 Ship Name/ Hull No. 合同签署生效的其他船舶编号 Hull No. of the other ships in the same contract 建造合同签署日期 Date of contract for construction “选择权”船舶C (单一建造合同的选择权船舶) Optional ships (optional ships signed in a single contract) 船名/船舶编号 Ship Name/ Hull No. 合同中其余“选择权”船舶的船舶编号 Hull No. of the other optional ships in the same contract 选择权生效日期 Date on which the option is exercised 建造计划/Construction Schedule: 图纸送审 Dwg. submitting 开工 Steel cutting 安放龙骨 Keel Laying 下水 Launching 交船 -Delivery CCS 项目标识号/CCS Project ID No 船舶登记号/Class No 建造合同日期定义Definition of date of “Contract for Construction “ as per IACS PR 29 (Rev.2): The date of “Contract for Construction “of a vessel is

文档评论(0)

1亿VIP精品文档

相关文档