- 1、本文档共41页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
;Unit 5 New Developments in Iron Making ;Part I Reading and Comprehensiontextpractice part II Translation skills;During the past century, many efforts were made to develop processes for producing iron for steelmaking that could serve as alternatives to the conventional blast furnace. This chapter presents a review of the alternative processes that have achieved some measure of commercial success.;1.Direct reduction technology In the history of iron and steelmaking technology, the first process is the direct reduction process. The blast furnace takes the place of the direct reduction process, which is the great improvement in the metallurgical technology. With the development of iron and steel industry, coke, on which blast furnace have depended for over 200 years, is becoming more expensive every year, and supplies of suitable coking coals are becoming scarcer. The direct reduction process was brought back at the end of the eighteenth century.;Midrex furnace has developed into a main production form of direct reduction processes, since the first steel plant was built and went into production in 1969.The largest Midrex furnace has an annual capacity of 800,000 ton.
The main components of the process are the shaft furnace, the gas reformer, and the cooling-gas system. Reducing gas enters the reducing furnace through a bustle pipe at the bottom of the reduction zone and flows countercurrent to the descending solids. ;The charge solids flow continuously into the top of the furnace through seal legs. The reduction furnace is designed for uniform mass movement of the burden by gravity feed, through the preheating, reduction, and cooling zones of the furnace. The cooled DRI is continuously discharged through seal legs at the bottom of the furnace. Cooling gases flow countercurrent to the burden in the cooling zone of the shaft furnace. The reducing top gas flows from an outlet pipe into the top-gas scrubber where it is cooled and the scrubber removes its
您可能关注的文档
- Unit 3 Celebration 基础知识自测 2011名师指津教材(高考英语).ppt
- unit 3 Cultural Diversity 跨文化的交际 大学.ppt
- Unit 3 Engine Mechanical System Service 《汽车实用英语》教材.ppt
- Unit 3 English Around the World Topic 1 Section A 九年级英课教材.ppt
- Unit 3 English Around the World Topic 1 Section C 九年级英课教材.ppt
- Unit 3 Enquiries 外贸英语函电教材.ppt
- Unit 3 Famous Cars 《汽车专业英语》教程文件.ppt
- Unit 3 Foundations PPT教材.ppt
- Unit 3 Growing Up 21世纪大学艺术英语教程2教材.ppt
- Unit 3 Leisure Activity 高等院校研究生英语系列教材 综合教程(上).ppt
- 2025贵州黔南州都匀市中小企业融资担保有限责任公司拟聘用人员考前自测高频考点模拟试题及完整答案详解.docx
- 2025贵州铁路投资集团有限责任公司招聘35人模拟试卷及参考答案详解1套.docx
- 2025贵州优建建筑劳务有限公司考前自测高频考点模拟试题及答案详解1套.docx
- 2025贵州银行金融科技相关岗位招聘10人考前自测高频考点模拟试题附答案详解.docx
- 2025第十三届贵州人才博览会沿河土家族自治县县管国有企业引才17人考前自测高频考点模拟试题及完整答.docx
- 2025赤峰环保投资有限公司招聘3人考前自测高频考点模拟试题及答案详解1套.docx
- 2025贵州安顺市社会科学界联合会招聘公益性岗位人员考前自测高频考点模拟试题及完整答案详解1套.docx
- 2025贵州金丽农业旅游产业发展集团有限公司招聘经理层高级管理人员(财务总监)1人考前自测高频考点模.docx
- 2025贵州黔东南州剑河县顺诚公司紧急招聘长期搔菌人员15人考前自测高频考点模拟试题及参考答案详解.docx
- 2025黑龙江东北林业大学土木与交通学院派遣人才招聘1人模拟试卷及参考答案详解.docx
文档评论(0)