- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
 - 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
 - 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
 - 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
 - 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
 - 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
 - 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
 
                        查看更多
                        
                    
                Venture North Sea Gas Limited(二)
                    ConocoPhillips.
Viking Replacement Pipeline
Environmental Statement Summary
To:	Wendy Kennedy
From:	Philip Bloor
Date:	30th April 2009
ES Title:	Viking Replacement Pipeline		Operator:	ConocoPhillips		Consultants:	Rudall Blanchard Associates Limited		Field Group (DECC):	London		ES Report No:	D/4023/2008		ES Date:	October 2008		Block Nos:	49/17  49/16		Development Type:	Pipeline		Project Description
The project comprises of:
The trenching and burial of a 27.3 km pipeline between Viking BP and LOGGS complexes in the southern North Sea;
The pipeline is 16” in diameter and has a 3” methanol line.
The pipeline will be trenched to a depth of approximately one metre using conventional ploughing techniques.
Patches of sand waves may be levelled to ensure pipeline integrity and safety.
Rock dumping will be required at pipeline crossings and pipeline ends.  There will also be some requirement to spot rock dump along the line to minimise the risk of upheaval buckling
Environmental Sensitivities
The EIA identified the following environmental sensitivities:
Fish spawning for mackerel, plaice, lemon sole, sandeel, sprat and Nephrops with peak periods scattered from January to July
Fishing nursery area for whiting, lemon sole, sandeel and Nephrops;
Generally low fishing activity;
Seabird vulnerability is very high during March, high during February, April, October and November.
Low numbers of cetaceans have been recorded with white-beaked dolphin and harbour porpoise most frequently recorded in the spring;
An area of relatively high shipping density;
Annex I Habitats:  The proposed project is in the North Norfolk Sandbanks pSAC.
Key Potential Environmental Impacts
Potential impacts and mitigation were addressed in the EIA:
The key areas of concern related to potential impacts arising from pipe laying activities in the pSAC.
These included impacts arising from:
Pre-pipe lay preparation – Prior to any pipe laying areas of sand waves may require pre-sweeping.  This activity physically
                您可能关注的文档
- Venture 73 Owners′ Annual Meeting Minutes(三).doc
 - Venture Advancement(一).ppt
 - venture apéros(六).doc
 - Venture Attributes(一).pdf
 - VENTURE BANKING(二).doc
 - Venture Business Summary(三).doc
 - Venture Capital - Typical constraints of VCF in LDCs(一).ppt
 - Venture Capital - Typical constraints of VCF in LDCs(二).ppt
 - Venture Capital 101(三).pdf
 - Venture Capital - an Engine for Growth the Prime minister′s.ppt
 
- Venture Out #52(二).doc
 - Venture Panel(一).pdf
 - Venture Partners(二).ppt
 - Venture Partners Management 3(四).ppt
 - Venture Partners Management 3(一).ppt
 - Venture Patrol Charter(一).doc
 - VENTURE PHILANTHROPY a new concept or an old idea re-wrapped(一).doc
 - VENTURE PHILANTHROPY IN PRACTICE(五).doc
 - Venture Planning for Community Action Agencies(一).ppt
 - Venture product description(一).pdf
 
原创力文档
                        

文档评论(0)