基于运输成本评判矿山开拓运输系统衔接分析-connection analysis of mine development and transportation system based on transportation cost evaluation.docxVIP
- 7
- 0
- 约7.23万字
- 约 62页
- 2018-08-14 发布于上海
- 举报
基于运输成本评判矿山开拓运输系统衔接分析-connection analysis of mine development and transportation system based on transportation cost evaluation
pit,a comprehensive analysis of viewing convergence of development and transportation system as the whole automotive transportation is being made.(2)Through field visits to identify factors compare two sections of the program;measuring in Qiabuqi limestone and collecting two program factors relevant data from technicians.( 3 ) By analyzing and calculating the measured data, we can get: the level heightdifference from 1395m the top of chute to main adit is 85m, the distance from main adit to crushing station is 1.2km; the trucking distance from 1395m level of stope to crushing plant is 1.3km. And when the entrance elevation is above 1341m, each chute section drops 12m resulting in car transport distance will be 0.15km shortened.(4)By measured data and theoretical analysis calculating the law that cost of the twotransportation programs changes in elevation,and then constructing the corresponding function and drawing corresponding function image with word.(5)By the calculation of function and comparison of function image, we can obtainthe convergence point that adit development and transportation system plan transforms into a full motor transport transportation scheme.Key words:Adit Chute;Motor transport;Combined Transport;Transportation Costs; Variation目录摘要................................................................................................................................IAbstract..............................................................................................................................II1 绪论....................................................................................................................................11.1 选题背景及研究意义..............................................................................................11.2 露天矿开拓运输系统..............................................................................................11.3 国内外研究现状................................................................................................
您可能关注的文档
- 基于蚁群算法和遗传算法的机器人路径规划分析-analysis of robot path planning based on ant colony algorithm and genetic algorithm.docx
- 基于蚁群算法软件行业工期固定-资源均衡优化决策及其实现-optimization decision and implementation of fixed time limit for a project - resource balance in software industry based on ant colony algorithm.docx
- 基于蚁群优化算法的车辆出行问题分析与应用-analysis and application of vehicle travel problem based on ant colony optimization algorithm.docx
- 基于蚁群优化的wsn路由算法分析-analysis of wsn routing algorithm based on ant colony optimization.docx
- 基于忆阻器的van der pol电路特性及混沌同步研究-research on characteristics and chaos synchronization of van der pol circuit based on memristor.docx
- 基于蚁群优化算法的批调度问题分析-analysis of batch scheduling problem based on ant colony optimization algorithm.docx
- 基于忆阻器的数据存储体系结构技术分析-technical analysis of data storage architecture based on memristor.docx
- 基于异步ds-cdma系统的混沌扩频序列的设计-design of chaotic spread spectrum sequence based on asynchronous ds - cdma system.docx
- 基于议价博弈的认知无线网络功率控制技术分析-analysis of cognitive wireless network power control technology based on bargaining game.docx
- 基于异步toa估计的超宽带室内定位系统的分析与实现-analysis and implementation of uwb indoor positioning system based on asynchronous toa estimation.docx
原创力文档

文档评论(0)