Contents of HT-7U (EAST) project (讨论稿).docVIP

  • 1
  • 0
  • 约2.51千字
  • 约 5页
  • 2018-09-29 发布于河北
  • 举报
Contents of HT-7U (EAST) project (讨论稿)

Contents of HT-7U (EAST) project (讨论稿) (Both for IACM and local STACM) No: Contents Chief Editor Remarks Overview Report for HT-7U project Wan, Yuanxi Overview Report Technical Basis For HT-7U Outline Design Weng, Pei de Overview Report Experimental progress and further plan on HT-7 as a test bench for t HT-7U project Wan, Bao nian Overview Report Physic Basis and Experiment Plan for HT-7U project Li, Jian gang Overview Report Engineering Design of Tokamak Device Wu,Song tao 5.1 TF System Pan, Yin nian 5.2 PF System Wu, Wei yue 5.3 Vacum Vessel Yao, Da mao 5.4 Thermal Shields Liao,Zi ying 5.5 Cryostat Yu, Jie 5.6 Divertor and In-verssel Components Yao, Da mao 5.7 Support Structures Wu, Song tao 5.8 Tokamak Assembly and Maintenance Wu, Song tao Gao, Da ming 5.9 Buildings and Services Zhang, Xiao don 5.10 Current leads Ding, Liren Design of Sub-Systems Weng, Pei de 6.1 Cryoplant and Cryodistribution Bi,Yan fan *Bai, Hong yu 6.2 Pumping and Fueling Guo, Xue mao 6.3 Power Supplies Liu,Zheng zhi 6.3.1 Power Supply for PF System Fu, Pen 6.3.2 Power Supply for TF System Liu, Xiao ning 6.3.3 Power Supply for Fast control Liu, Zheng zhi 6.4 Control and Data Handling Luo, Jia rong 6.5 Divertor System Li, Jian gang 6.5.1 Physics Design Zhu Si zheng 6.5.2 Pumping System Gu, Xue mao 6.5.3 PFM Chen, Jinling 6.6 LCHD System Kuang, Guang li 6.7 ICRH System Zhao, Yan ping 6.8 ECR Fang Yude 6.9 NBI Hu and Hu 6.10 Diagnostics Wan, Bao nian 6.11 Water Cooling Zhang,Xiang qin 6.12 Power Station Sun Shihong Operation Scenarios Li, Jian gang 8. Safety and Environment Wu, Yi can 9. Budget and Schedule Wang, Kong jia 10. Project Management Wang Kong jia 11. Test Facilities, RD and Fabrication Gao,Da ming 11.1 SC magnets tests and Facility Wu, Yu 11.2 CICC J

文档评论(0)

1亿VIP精品文档

相关文档