6Sigma定义衡量阶段之过程能力.ppt

  1. 1、本文档共54页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
6Sigma定义衡量阶段之过程能力

Process Capability Johnson Controls, Inc. 3-27-2001 * Stable process No Defective rate - .03195 or 3.2% Process Capability Johnson Controls, Inc. 3-27-2001 * 302 / 9453 = .03195 then go to body of table Process Capability Johnson Controls, Inc. 3-27-2001 * Percent defective and defects - long term data proportion defective means body of table Process Capability Johnson Controls, Inc. 3-27-2001 * Poisson - multiple defects Process Capability Johnson Controls, Inc. 3-27-2001 * Yes - stable Average DPU - .1237 or 12.37% Process Capability Johnson Controls, Inc. 3-27-2001 * 4963 * 6 = 29778 614 / 29778 = .02 Process Capability Johnson Controls, Inc. 3-27-2001 * Go to body of Z table Process Capability Johnson Controls, Inc. 3-27-2001 * Long term - needs to take in all the conditions and changes under normal controls By nature of attribute data - large sample size over time - consider attribute data long term Process Capability Johnson Controls, Inc. 3-27-2001 * Use excel spread sheet - pass code Jim Quilan Process Capability Johnson Controls, Inc. 3-27-2001 * Demonstrate sigma calculator use excel spread sheet file - defects 520, 4963,6 long term data - estimates short term DPMO is first choice Cpk - normal data Ppk - weibull Process Capability Johnson Controls, Inc. 3-27-2001 * Process Capability Johnson Controls, Inc. 3-27-2001 * Process Capability Johnson Controls, Inc. 3-27-2001 * This is OK as long as the Spec limits stay the same Process Capability Johnson Controls, Inc. 3-27-2001 * Sigma Level is number of Std Dev that can fit between specs Sigma Level - number of Std Dev from the center to the specs 6 Sigma - is CpK of 2.0 Process Capability Johnson Controls, Inc. 3-27-2001 * No set length of time - does it capture all the variation Long Term - more variation opportunities captured over longer time periods Black Belt must use process knowledge to know if captured all / most of the possible variation possibilities LT ST: after control, 3

文档评论(0)

qiwqpu54 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档