广联达钢筋抽样检查办法(Sampling inspection glodon reinforced measures).docVIP

  • 6
  • 0
  • 约1.78万字
  • 约 19页
  • 2018-06-15 发布于江西
  • 举报

广联达钢筋抽样检查办法(Sampling inspection glodon reinforced measures).doc

广联达钢筋抽样检查办法(Sampling inspection glodon reinforced measures).doc

广联达钢筋抽样检查办法(Sampling inspection glodon reinforced measures) To check the reinforced glodon sampling project (1) basis: 1, independent foundation: frame structure used more, in the calculation of steel bar should pay attention to the length of the bottom of the steel bar, the length or width of 0.9 times, and staggered arrangement; 2, the raft foundation: General for shear wall structure, we can study the contents of 04G101-3, for example, sinking reinforcement sub raft in the board should stretch out side LA (minimum anchorage length) some specific requirements etc.. 3, strip foundation: generally used for brick concrete structure. (two) upper member: 1, column: column steel is relatively simple, only longitudinal reinforcement and stirrups. The longitudinal reinforcement should pay attention to the bottom of the foundation reinforcement, top column longitudinal reinforcement for different anchorage length of side column, column, the column can see (03G101); attention to the value of stirrup length: the bottom column encryption area root encryption =Hn/3, the upper column encryption length =Hn/6, =500 take the big value, also pay attention to the column overlap range should be encrypted. (Hn refers to Zhu Jinggao on the floor) 2, beam: beam reinforcement should be calculated in accordance with 03G101. The upper beam reinforcement, long bearing negativereinforcement (a row of two row 1/3Ln, 1/4Ln, Ln is about two larger span value), the bottom ribs generally in accordance with each cross to the both sides respectively support into the anchorage length of the. 3. Shear wall: the component in the shear wall must be calculated completely. Including: the wall (horizontal distribution reinforcement reinforcement and longitudinal reinforcement, should pay attention to the level of reinforced wall and wall junction of anchorage, anchorage angle requirements are not the same), reinforced columns (wing wall and wall part of the handover, the formation of pillars) connecting b

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档