- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某高墩连续弯箱梁受力分析_毕业论文
题 目 ________________________________
院 (系)________________________________
专 业 ________________________________
学 号 ________________________________
起止日期 ________________________________
设计地点 ________________________________
某高墩连续弯箱梁桥的受力分析
摘 要
钢筋混凝土箱梁由于具有截面抗扭刚度大、能够满足顶板和底板配筋要求、截面效率高、适应性广等优点,因而在各种桥梁中被广泛使用,成为现代桥梁重要的结构形式。而连续弯箱梁桥的受力情况比较复杂,且已经建成的弯桥中往往出现很多问题。
本设计为某高速公路连续弯箱梁桥受力分析,匝道桥全长186.06m,跨径布置为9×20m。箱梁平面线形呈S弯形;在桥梁经常性检查期间,发现4#墩墩柱下端存在5条环状裂缝,分布在地表以上3m高度范围内,故需要对桥墩进行受力分析并进行桥墩加固。
在本设计中,运用了桥梁设计软件Midas对桥梁结构进行模拟,建立包括桥墩在内的桥梁模型。支座采用弹性连接模拟,并以土弹簧模拟桩土相互作用,同时考虑自重、温度、离心力和移动荷载等荷载情况,进一步完善模型。接着在各种荷载的组合下,对桥梁进行详细的有限元分析,并将分析结果与规范的要求进行对比,对主梁的应力、变形等进行验算,从而判断在设计荷载作用下该设计是否足够合理安全。然后,对受力较大的桥墩进行受力分析,验算其裂缝,在对比碳纤维加固、钢板加固、扩大截面加固等方案后,最后给出碳纤维加固的方法。
关键词:弯桥;箱梁;受力分析;桥墩加固;碳纤维。
Stress Analysis of a High Pier Continuous Curved Box-girder Bridge
Abstract
Reinforced concrete box-girder has a high section torsional rigidity. It can provide enough area for reinforcement at both the top deck and the bottom deck. And because of that, the reinforced concrete box-girder has been widely used in a variety of bridges. Nowadays, it has become an important structure in the form of the modern bridge. While, the force situation of continuous curved box-girder bridge is more complex, and many problems have appeared in many completed continuous curved bridges.
This design is a mechanical analysis for a continuous curved box-girder bridge of a highway road. The bridge is 186.06m in length, with nine spans of 20m. The box-girder horizontal alignment is an S-curved. During regular check of the bridge, it was found that there are five circular cracks at the bottom of the 4th pier column. They are distributed in the 3m height range above the surface. So it is necessary to analyze the forces in the columns of piers and reinforce the piers with cracks.
In the design, the Midas, a bridge design software, is used to simulate the bridge structure. A model of the bridge was created, including the piers. And the elastic s
您可能关注的文档
- 最新2015-2016学年新课标冀教版小学六年级数学教案全册.doc
- 最新2015-2016学年新目标广东版开心版小学六年级英语上册Unit2 Looking for a Hospital第一课时.pptx
- 最新2015-2016学年新课标外研社版小学英语四年级上册教案全册.doc
- 最新2015-2016学年新课标人音版小学一年级音乐下册教案全册.doc
- 最新2015-2016学年新目标外研版七年级上册Module4Unit1We’ve got lots of apples课件.ppt
- 最新2015-2016学年新目标仁爱英语初中八年级上册Unit1 Playing Sports topic1 I am going to play basketball.ppt
- 最新2015-2016学年春季学期人美版小学二年级美术下册教案全册.doc
- 最新2015-2016学年春季学期湘少版小学五年级英语下册教案全册.doc
- 最新2015-2016学年春季学期湘教版初中七年级数学下册教案全册.doc
- 最新2015-2016学年湖南文艺出版社小学六年级音乐上册教案全册.doc
文档评论(0)