CG PC Measured Demand Over Control Area - ….doc
Settlements Billing
Configuration Guide: Measured Demand Over Control Area
Pre-calculation
Version 5.11
Table of Contents
1. Purpose of Document 3
2. Introduction 3
2.1 Background 3
2.2 Description 8
3. Charge Code Requirements 9
3.1 Business Rules 9
3.2 Predecessor Charge Codes 14
3.3 Successor Charge Codes 14
3.4 Inputs – External Systems 15
3.5 Inputs – Predecessor Charge Codes or Pre-calculations 20
3.6 CAISO Formula 24
3.7 Outputs 72
4. Charge Code Effective Date 104
Purpose of Document
The purpose of this document is to capture the requirements and design specification for a SaMC Charge Code in one document.
Introduction
Background
In the allocation of various payment and charges, the amounts are divided among Business Associates (BAs) in proportion to their relative contribution to the overall Measured Demand quantity (in MWh) over which the allocation is performed. Thus, an allocation of payment or charges requires the following two Measured Demand calculations that are conducted for the particular time period over which the allocation is performed:
the overall metered CAISO Demand plus Real-Time Interchange export schedules, excluding that portion of Demand of Non-Generator Resources dispatched as Regulation through Regulation Energy Management, in the grid sector or area over which the allocated payments and charges apply and
the contribution of each Business Associate to the overall CAISO Demand plus Real-Time Interchange export schedules, excluding that portion of Demand of Non-Generator Resources dispatched as Regulation through Regulation Energy Management.
To provide the Measured Demand quantities that are used in multiple charge code calculations that allocate various payments or charges, the CAISO implements a set of Pre-calculation processes, referred to as Measured Demand Pre-calculations, to calculate particular Measured Demand quantities. There are five (5) Measured Demand Pre-calculation configurations in which an overall Measured D
您可能关注的文档
- 运用故事型教学提高小学英语低段教学活动效果的实践研究【最新资料】.doc
- 秘密:温州人为什么会成为富人?.doc
- 湖南专用新课标2014高考英语二轮复习方案 专题限时集训18 故事型阅读理解(可编辑).doc
- 众片傍-泰囧-跟风拍摄大多数恐将血本无归.doc
- 高校教师心理压力及组织管理研究_论文.docx
- 谁是又矮又蠢的大胖子.doc
- 关于主观幸福感与经济学的文献综述.doc
- 大学生主观幸福感的人格-环境交互理论研究.doc
- 人的价值:如何通过短时间(半个小时到一个小时)的交谈和观察判断对方的人格特征和价值取向? 人的价值.doc
- 第一章函数与极限 学习指导书.doc
- 重力储能系统行业发展趋势预测及战略布局建议报告.docx
- 产业园区开发建设2025年社会稳定风险评估与产业园区产业孵化报告.docx
- 文化创意礼品定制企业核心竞争力构建与市场拓展研究报告.docx
- 船舶制造2025年订单分析报告:新型船舶材料技术创新趋势研究.docx
- 自修复固件系统行业发展趋势预测及战略布局建议报告.docx
- 《2型糖尿病与心血管疾病》课件.ppt
- 自组织Mesh通信网络行业发展趋势预测及战略布局建议报告.docx
- 单身经济背景下的家电市场:2025年小型家电产品市场发展趋势研究报告.docx
- 2025年网络安全事件对社会稳定风险的应急响应报告.docx
- 2025年汽车零部件行业新能源材料供应链研究报告.docx
文档评论(0)