RF Contol and Low Noise Master Oscillator射频控制和低噪声主振荡器.pptVIP

RF Contol and Low Noise Master Oscillator射频控制和低噪声主振荡器.ppt

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
RF Contol and Low Noise Master Oscillator射频控制和低噪声主振荡器

Overview of SMTF RF Systems Brian Chase Overview ? Scope of RF Systems RF LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress Conclusions Scope of RF Systems A0 - Gun and cavity Meson (Oct, 05) - CC2 Meson (06) - Proton Driver A0 Upgrade (06) - Gun, CC1, CC2, 3.9 Acc, 3.9 Deflecting IB1 Horizontal Test Stand Multi- module support CW Program RF LLRF Collaboration ? Fermilab Accelerator, Technical, and Computing Divisions ? DESY ? Penn State ? SNS and Jlab advisory capacity for now ? We want to expand this engineering collaboration! LLRF Specifications for SMTF (Most Stringent Compilation) 1 to 4.5 ms pulse length or CW operation Variable rep rates up to 15 Hz 0.1 deg, 0.1% pulsed, 0.01 deg, 0.01% CW 325 1300 MHz warm/cold, and 3900 MHz cold only Multiple cavity per klystron operation Piezo tuner control Ferrite Vector Modulator control Progress So Far We have a DESY prototype FPGA LLRF controller that has been tested on the 9 cell cavity at A0. This system is now in the lab at the Magnet Test Facility where we have some libraries but not the operational source code. A stand alone LLRF system is planned for October EPICS control efforts are getting organized A design for a Low Noise master Oscillator is underway Meetings have been held to bring more people into the effort. An RF modeling and simulation group has been meeting for the Proton Driver. These efforts will spill over to the ILC. KLYSTRON INTERLOCKS Conclusions High Power RF and Modulators are on a clear path. Interlocks are in the design stage, will be ready for the October test LLRF is moving forward with a collaborative effort Simulation for Proton Driver are underway - could apply to ILC * SIMCON 2.1 setup at A0 – March 2005 Two modulators are being built One modulator end of this year, other early next year One with 4.2 ms flat top, other with 1.4 ms flattop Peak Output is 120 kV, 140 A Average Power is 310 kW Modulators 1.3 GHz 300 Kwatt Klystro

您可能关注的文档

文档评论(0)

erterye + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档