Dual String Gas Lift Well with Injection Pressure Valve :注射压力阀双柱气举井.pptVIP

Dual String Gas Lift Well with Injection Pressure Valve :注射压力阀双柱气举井.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Dual String Gas Lift Well with Injection Pressure Valve :注射压力阀双柱气举井

CASING HEAD PRESSURE FINE TUNING in Dual String Gas Lift Well With Injection Pressure Operated Valve By: Gatut Widianoko ( Weatherford ) Herry Subekti ( BP – Indonesia ) Wahyu Jatmiko ( BP – Indonesia ) Abstract Offshore North West Java Oil Field CHP Fine Tuning Candidates Wells ( Gas Lift Optimization ) Suddenly production rate drop Suddenly the well dead Casing Head Pressure unstable Suddenly gas injection rate increase/decrease Inaccurate gas rate measure Robbing, and cause one (1) string dead or drop The well shutdown under maintenance The well shut-in while service status Gas lift Change out is being perform Suddenly Casing Head Pressure Increase Suddenly Casing Head Pressure decrease Suddenly Flowing Tubing Head Pressure increase Casing Head Pressure Tuning Steps in Dual Gas Lift well Use graphical method to construct the well condition. Draw the static and flowing pressure gradient, etc. Select Kick Off and best Operating pressure available. Use 90% (max) off Kick Off as Operating pressure. Select best point of injection of both string ( close or same depth ) and operating port size (close or same size). Use same surface opening and closing pressure for both string valve. Perform gas lift well performance by software on each string to determine optimum condition . Perform CHP tuning by open the Gas Lift Header Choke and set at the kick off pressure selected. Adjusts the CHP slowly to reach the Best Surface Operating Pressure selected. Record the Rates. Select the best rate and keep best CHP. Why Do Casing Head Pressure tuning instead of Gas Injection Rate Tuning ? WHAT IS BEST CHP Where is the existing CHP ? Is it too high ? Any un-loader valve reopen? Is the existing gas in too much ? Do We need to decrease it ? OR Is it too low ? Is the existing gas in too low ? Can the existing CHP pressure reach the operating valve ? Do we need to Increase it ? Any actions needs to be done ? Some Wells Sample

文档评论(0)

wuyoujun92 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档