SCRF Input CouplerspptSCRF输入couplersppt.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SCRF Input CouplerspptSCRF输入couplersppt

CC2 Input Coupler Introduction, Installation, Processing Tim Koeth November 16th, 2005 Input Coupler Delivers power that develops gradient Typical Input Coupler Input Coupler Input Coupler Installation Cavity is assembled in Class 10 CR with 80K window and cold bellows. Input Coupler Installation After the cavity was installed in the cryo vessel, we installed the rest of the input coupler. Input Coupler Installation After the vacuum portion was sealed up, a 150C bake performed to remove water. Ramp ~ 6oC/hr Dwell 24 hrs at 150oC P 1e-5mbar Input Coupler Installation Be certain to protect warm ceramic window during bake. Never place heat tape directly on ceramic ! Input Coupler Installation After bake out, finish Wave Guide Hat installation. Input Coupler Processing PMT looking for sparking in vacuum portion Input Coupler Processing PRESENT DESY S/ H WARE THRESHOLDS: Value FS Conv. Value Software Threshold Hardware Threshold e- 5mA ? 10V 0.5 ~ 1 V 5 ~ 6 V PMT 1 LUX ? 10 V 1 ~ 3 V 5 ~ 6 V P.D. ------ ----- 0.2 V Temp Cerm. 70oC 90oC In-Cplr Vac 1~2E-7 mbar 1E-5mbar The spark interlock is NOT reset! One must inspect the copper waveguide and warm ceramic window after such an event. Input Coupler Processing PROCESS CONTROL LOGIC: SOFTWARE LOGIC: After each RF pulse, if e-, PMT, light, vacuum, temperature etc signals are higher than the threshold value the power is decreased by one step, if not then the power is increased by one step. HARDWARE LOGIC: In addition to the software limits used during processing, there are hardware interlocks with greater trip thresholds. The RF is shut off with the “fast switch” when the Hardware Threshold is exceeded. In the event of a Hardware trip: 1. Turn RF off 2. Wait three minutes 3. The conditioning program tries to reset the interlock 4. If reset is successful, RF power setting is set to the minimum (starting) value, and program does fast power increase (10 steps in 10 seconds) to about 90 to

文档评论(0)

wuyoujun92 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档