- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
质量计划QUALITY PLAN
质量计划
QUALITY PLAN
TABLE OF CONTENTS
QUALITY PLAN 0
1. INTRODUCTION 3
1.1 PURPOSE 3
1.2 SCOPE 3
1.3 PROJECT QUALITY SYSTEM 3
1.4 Terminology 4
1.5 Statement Of Authority 4
1.6 Control Of The Quality Plan 5
1.7 Definition 5
2. ORGANIZATION 5
2.1 Project Organization 5
2.2 QUALITY ORGANIZATION 7
2.3 Quality Responsibility 7
2.3.1 Project Manager 7
2.3.2 Project Quality Manager 8
2.3.3 Design Manager 8
2.3.4 Procurement Manager 9
2.3.5 Construction Manager 10
3 SCOPE OF ACTIVITIES 10
3.1 EPC ACTIVITIES - QUALITY ASSURANCE 11
3.1.1 AUDITS 12
3.1.2 TRAINING AND QUALIFICATIONS 12
3.1.3 CORRECTIVE AND PREVENTIVE ACTION 13
3.2 ENGINEERING 13
3.3 PROCUREMENT 19
3.3.1 Responsibility 21
3.3.2 Interface relation 21
3.3.3 Procurement work program 21
3.4 CONSTRUCTION 24
3.4.1 General 24
3.4.2 Basis of the plan: 24
3.4.3 Construction quality management group of the project 24
3.4.4 Workflow chart of Construction Quality Assurance System 26
3.4.5 Quality control and management at all construction stages 31
4 Control of Non-conformance 42
4.1 Control of design nonconformance 42
4.2 Control of purchasing nonconformance 43
5、Correction and Protection Methods 43
6.0 Communication 44
6.1 Languages 44
6.2 Communication Mediums 44
6.3 Meetings 45
6.4 Records and reports 45
7 Training 45
8 Inter Audit 46
8.1 Audit Plan 46
8.2 Notification 47
8.3 Audit Performance 47
8.4 Audit Findings 47
8.5 Corrective Action/Close-out and Sign-off 48
8.6 Records 48
8.7 Audit Personnel 48
9 Referrence 48
9.1 Project QA DOCUMNETS 48
9.2 SHEJIDANWEI QA/QC Document 49
9.3 SHEJIDANWEI2 (XX) QA/QC Document 49
9.4 CAIGOUDANWEI QA/QC Document 49
9.5 SHIGONGDANWEI QA/QC Document 49
10 Attachment 49
10.1 Attachment 1 – Quality Audit Checklist 49
10.2 Attachment 2 – Quality Audit Finding 49
1. INTRODUCTION
This Quality Plan has been developed to comply with the YEZHU/PMC Contract requirements, together with the members of the EPC Quality Assurance Manual.
1.1 PURPOSE
The purpose of the Project Quality Pl
您可能关注的文档
最近下载
- 力帆 2019款 KP350 摩托车适用2019款2020款 用户说明书 保养手册.pdf
- 2025-2031年中国COSPLAY服装行业市场全景评估及投资战略研究报告.docx
- 解数咨询-全价猫主粮行业调研报告:醇粹、高爷家.docx VIP
- 剑桥少儿英语二级下册unit2.ppt VIP
- VSD负压引流术护理查房.pptx VIP
- 大众奥迪诊断系统ODIS7.21用户手册.pdf VIP
- 《混合动力电动汽车》课件.ppt VIP
- 网神日志审计系统技术白皮书.doc VIP
- 高级英语第一册-U10-The-Artist-in-America.ppt VIP
- 狗主粮行业调研报告解数咨询14117mb.pptx VIP
文档评论(0)