- 2
- 0
- 约2.94千字
- 约 22页
- 2018-06-24 发布于四川
- 举报
FMC SPILL SITE - Home - Rice UniversityFMC漏油点-家居-莱斯大学
Section 7 Supplement: FMC Tanker Spill FMC SPILL SITE July 11, 1996: Tanker truck turned over spilling 6000 gallons (23000L) gasoline 500ft (150m) North from Bear Creek Emergency Response Team observed no standing gasoline, rapid infiltration The ERT was unable to locate subsurface free product FMC SPILL SITE 10ft (3m) dry silty sand top layer, 10ft (3m) wet sandy clay with gravel underneath Porosity ~0.4 Conductivity ~85ft/d (26m/d) Aquifer thickness ~20ft (6m) Groundwater surface ~7ft (2m) below ground surface Gradient estimated to be 0.0174 towards the southeast FMC SPILL SITE Contractor #1 (07/96) Geoprobed site to identify location of free product (07/96) Installed 4 monitoring wells Suggested air-sparging system (State did not approve) State noticed drillers were not licensed, equipment not registered (08/96) FMC SPILL SITE FMC Geoprobed site, found 6” (15cm) free product along the north and south side of highway (08/96) Installed an interceptor trench south of the highway Recovered free product from trench (09/96) FMC SPILL SITE Contractor #2 (09/96) Geoprobed site to locate free product and plume (10/96) Free product plume about 400ft (120m) long and 100ft (30m) wide Pump test showed tranmissivities ranging 1100-2000 ft2/d (100-186 m2/d) Estimated conductivity was 85ft/d (26m/d) Interceptor trench showed 3 (8cm) free product (10/96) FMC SPILL SITE Contractor #2 (Cont.) Installed 5 remediation wells, depth around 24ft (7m) inside interceptor trench (11/96) Manual operation of free product recovery system started in January 1997 Remediation system running 24h/d halfway March 1997 Pumping rates ~18 GPM (68 L/min), creating drawdowns of ~15ft (4.5m) FMC SPILL SITE Contractor #2 (Cont.) Never got more than 100 gallons (378 L) of free product from recovery system (07/97) Contractor terminated in 07/97 Contractor #3 (07/97) Unable to continue with existing system, remediation 3 weeks down. 2 MWs showed 19” (48cm) free product Dual Phase extraction system operat
您可能关注的文档
- chapter_4组织行为学.ppt
- Constant Positive Airway Pressure - Paulo Roberto Margotto持续气道正压通气-保罗-罗伯托margotto.ppt
- Communicating for Results, 7e:沟通结果,7E.ppt
- Combining Elements - Noadswood School:结合元素noadswood学校.ppt
- Competitive & Industry Dynamics:竞争和行业动态.ppt
- CONTACT STRUCTURES - Home Koç Üniversitesi接触结构-家居Ko & # 231;与# 220 niversitesi;.ppt
- Chapter 4 Random Variables and Probability Distributions_3296:4章随机变量和概率distributions.ppt
- CRM案例分享——汇丰银行如何定义其最佳客户.ppt
- charge pump基本原理和参数计算.ppt
- c东方之门鉴宝活动策划方案.ppt
最近下载
- 中小学生端午节假期安全教育主题班会PPT课件.pptx VIP
- 机器人等级考试三四级资料-第01课:初识Mixly和Fduino UNO.pptx VIP
- FULING富凌H200空压机中文说明书说明书用户手册.pdf
- Praat语音软件操作手册.docx VIP
- 2025-2026学年重庆市江津实验中学、田家炳中学、李市中学、白沙中学等金砖六校九年级(上)期末化学模拟试卷(含答案).pdf VIP
- 阿特拉斯•科普柯 冷冻式干燥机.pdf VIP
- 重庆市九龙坡区2024-2025学年九年级上学期期末考试数学试题(含答案与解析).pdf VIP
- 浙江省杭州市富阳区2023-2024学年三年级上学期数学期末试卷.docx VIP
- TXFQC-合成橡胶消防水带.pdf VIP
- 重庆市九龙坡区渝高教育集团2024-2025学年九年级上学期期末考试物理试题(含答案).pdf VIP
原创力文档

文档评论(0)