江苏国信宜兴2×400MW级燃机电气主接线选择考虑
江苏国信宜兴2×400MW级燃机电气主接线选择考虑
摘要:由于目前燃气轮发电机与火电机组的拖动原理和发电性质都存在不同,故接线方式也都不相同。本文主要针对我厂2×400MW级燃机在初步设计中遇到电气主接线使用何种形式的问题进行探讨
关键词 : 燃气轮发电机;发电机出口断路器GCB;励磁变;厂用电接线方式
Abstract: the current gas turbine generator and drag the principle of thermal power unit and power generation are different, so the connection mode are not the same. This article mainly aims at plant 2 x 400 mw grade CCGT encountered in the preliminary design discusses the use of what form the main electrical wiring
Key words: gas turbine generator; Generator outlet circuit breaker GCB; Excitation variable; Auxiliary power wiring