- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于斜拉桥英文
Study on nonlinear analysis of a highly redundant cable-stayed bridge
1.Abstract
A comparison on nonlinear analysis of a highly redundant cable-stayed bridge is performed in the study. The initial shapes including geometry and prestress distribution of the bridge are determined by using a two-loop iteration method, i.e., an equilibrium iteration loop and a shape iteration loop. For the initial shape analysis a linear and a nonlinear computation procedure are set up. In the former all nonlinearities of cable-stayed bridges are disregarded, and the shape iteration is carried out without considering equilibrium. In the latter all nonlinearities of the bridges are taken into consideration and both the equilibrium and the shape iteration are carried out. Based on the convergent initial shapes determined by the different procedures, the natural frequencies and vibration modes are then examined in details. Numerical results show that a convergent initial shape can be found rapidly by the two-loop iteration method, a reasonable initial shape can be determined by using the linear computation procedure, and a lot of computation efforts can thus be saved. There are only small differences in geometry and prestress distribution between the results determined by linear and nonlinear computation procedures. However, for the analysis of natural frequency and vibration modes, significant differences in the fundamental frequencies and vibration modes will occur, and the nonlinearities of the cable-stayed bridge response appear only in the modes determined on basis of the initial shape found by the nonlinear computation.
2. Introduction
Rapid progress in the analysis and construction of cable-stayed bridges has been made over the last three decades. The progress is mainly due to developments in the fields of computer technology, high strength steel cables, orthotropic steel decks and construction technology. Since the first modern cable-stayed bridge was built in Sweden in 1955, their
您可能关注的文档
- 全隐框玻璃幕墙的设计计算书.doc
- 全面清洁度控制与诊断趋势.doc
- 全面而专业市场调查问卷设计.doc
- 全面运行命令和cmd命令符使用命令.doc
- 全面风险管理及内控体系建设要求.doc
- 八上30课古诗复习卷有的答案.doc
- 八上三角形内角与为180°.pptx
- 八下半期考试及的答案.doc
- 八下分式同步训练题7份及的答案.doc
- 全省统一表格操作手册 广东省建设工程施工的资料管理信息系统.doc
- 2026年中国卧式可调低浓水力碎浆机市场调查研究报告.docx
- 2026年中国大功率专业用超声波清洗机市场调查研究报告.docx
- 2025年学历类自考国际商务英语-学前特殊儿童教育参考题库含答案解析.docx
- 2026年中国低音炮有源音箱市场调查研究报告.docx
- 2026年中国电磁粉末制动器市场调查研究报告.docx
- 2026年中国圆盘式脚手架市场调查研究报告.docx
- 2026年中国低噪音振动给料机市场调查研究报告.docx
- 2026年中国指纹门禁考勤机市场调查研究报告.docx
- 2025年事业单位工勤技能-山西-山西舞台技术工三级(高级工)历年参考题典型考点含答案解析.docx
- 2025年学历类自考经济学(二)-幼儿文学参考题库含答案解析.docx
原创力文档


文档评论(0)