上部结构技术交(英文版)
施工技术交底记录Record of Construction Technical Disclosure (CTD)交底日期Date of disclosure:2015年(Year)月(Month)____日(Day)工程名称 Project项目施工图号 Drawing#单位工程名称 Package(Unit)施工单位Construction sub-con分部(项)工程名称 Sub divisional work(Specified)主体钢筋 Reinforced bar used for main structure施工班组Construction working crew(工种Designation)钢筋班Reinforced bar team技术交底内容 Content of technical disclosure:1、钢筋进场必须具有合格证并经抽样送复试合格后方准使用 The rebar delivered to the site shall be attached with quality passed certificate and samples shall be taken for test before using. It can be allowed to use on site unless it has passed the sample test.2、