- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理业英文文献及翻译((毕业论文)专用)
石家庄铁道大学四方学院毕业论文
PAGE \* MERGEFORMAT 1
附 录
Engineering supervision system in Chinas Engineering construction in the position
With the dominance of Chinas socialist market economy, the determination of the project supervision system in Chinas highway construction is gradually becoming more mature. Talking about the project in the country, people always focus on project quality side, it seems that the focus of the task of supervision is to protect the quality of projects, in fact, it is very comprehensive, according to FIDIC provisions in the project construction, project quality, of course, crucial, but only to protect the project supervision of the three objectives (quality, duration, cost), one of these three goals are interrelated and influence, from different angles to protect the owners of the project efficiency. Of which cost control is also very important to the management aspect of this work, good or bad, is directly related to whether the quality of the project can achieve the desired goals, and whether the progress can be completed on time.
First, the design phase of the design phase of Supervision
The introduction of engineering supervision, determine a reasonable design, mature technology, reduce the construction phase of major design changes and program changes to occur, the effective cost control will play a certain role. Experts say: If the project supervision involved in the design stage, then, and can be ruled out, to correct 80% of the errors, but to the construction stage to be involved in supervision of works, at best, can only save 20% of the investment. According to the information briefing, a German university laboratory building, the original design is three and a basement, the project management company to meet the commissions space requirements and functional conditions, proposed to increase the layer to shorten the two-axis then the abolition of the basement. But also reduces the flow of people to evacuate distance (to the required stand
您可能关注的文档
- 环境工程-技术专业毕业实习报告.doc
- 环境影响评价全本公示拟对中复神鹰碳纤维有限责任公司年产3500吨聚丙烯腈原丝与1500吨SYT45高性能碳纤维技术改造项目环境影响报告书作出审批意见的公示47.doc
- 环境影响评价分析报告公示万块页岩煤矸石烧结砖环评报告.doc
- 环境影响评价分析报告公示台江久润燃气石油液化气储配站建设建设地点台江经济开发区环评报告.doc
- 环境影响评价分析报告公示危险废物收集贮存环评报告.doc
- 环境影响评价分析报告公示环保型金属表面处理建设环评报告.doc
- 环境影响评价分析报告公示液化石油气储配站环评报告.doc
- 环境影响评价分析报告公示平坝县优质肉牛养殖基地建设建设地点贵州省平坝区乐平环评报告.doc
- 环境影响评价分析报告公示青岛国海生物制药新型酶制剂生线建设公示环评公众参与环评报告.doc
- 环境影响评价分析报告公示食品加工生猪屠宰环评报告.doc
原创力文档


文档评论(0)