- 10
- 0
- 约1.85万字
- 约 60页
- 2018-09-07 发布于湖北
- 举报
精益生产-line_balance_models_(中英文版)
Line Balance Model * Model will build the following graph which shows how we should plan to: Staff in equal increments (to limit having to re-balance line) Vary hours worked to get complete coverage of demand requirements Process Balance Model:Step 4 (Cont.) Line Balance Model * 模型可建立如下图说明: 每一阶段需要的人力 完成任务需要的工作时间 过程平衡模型:步骤 4 (续.) Line Balance Model * Step 5 Plot current operating range to determine labor reduction required to meet operating goals Process Balance Model:Step 5 The model has calculated that at a rate of 150 units/day, the area should be working a 6 hour shift with 7 processors
您可能关注的文档
最近下载
- DELL厦门工业厂房施工组织设计(1).doc VIP
- WA6515塔吊性能说明书-WA6515-10B 操作手册.pdf VIP
- 2026年中国天麻市场运行动态监测及发展前景投资预测报告.docx
- 3.数据的价值课件 浙教版信息科技四年级上册.pptx
- 铁路线路防护栅栏(通线〔2023〕8001)上.pdf VIP
- 23G409 先张法预应力混凝土管桩.docx
- 《货物站台墙》专房(03)4046.pdf VIP
- 专房(03)4046:货物站台墙.pdf.doc VIP
- 2026越秀区大东街道办事处公开招聘综合事务中心辅助人员2人考试备考题库及答案解析.docx VIP
- 《观察周边环境中的生物》教案.docx VIP
原创力文档

文档评论(0)