- 1、本文档共128页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Restrctring Internatina Units– Fina reprt n prject–Phiipp Hzmann Grp
BER-0070-01678-03-24.ppt Key questions need to be addressed Key questions Integration process with Units? Integration with domestic process of controlling? What accounting system to use as basis? BER-0070-01678-03-24.ppt NoteThe statements made by Roland Berger Partners are based onassumptions held to be accurate on the basis of the information available.However, Roland Berger Partners assume no liability for the correctness of the assumptions made herein BER-0070-01678-03-24.ppt Larger, but low and medium risk projects need to be carefully watched because of their high potential impact on results PH International: Risk Monitoring Map1) Source: Controlling 1) Risk or Operative Result Amount at risk (DM m) Level of risk High risk: DM 0.8m Moderate risk: DM 5.0m Low risk: DM 9.7m 0 7 High risk Moderate risk ? Intl Div Building: FRA Schule 0.8DM m Result Intl Div Civil: 2.6DM m Result impact Overseas AST: 1.3DM m impact PH Latina: 1.6DM m Result impact Nord France Intl: 6.8DM m Result impact ? ? ? Low risk Nord France Intl: 0.4 Result impact ? Intl Div Building: 2.0DM m Result impact ? ? BER-0070-01678-03-24.ppt Most items on the list require review in the next 1-3 months PH International : Worst case scenario High risk Intl Div Building DM 0.8m on French School. 2 months watch Moderate risk Nord France Intl: New order risk of DM (0.6)m impact on Operative Results of DM 0.1m Mali claims of DM 0.3m. 3 months watch Intl Div Civil: Total revenue risk of DM 22.3m and operative result risk of DM 2.6m. Of this , new order risk of DM 20m and Revenue Risk of DM 2.3 m and balance is from Singapore project. 1-3 months watch Intl. Div Building: New order revenue risk of DM 29m margin impact of DM 2m. 3 months watch Low risk Nord France Intl: Receivables of Guadeloupe, Construction material write-off loss, litigation risk of DM 6.8m. 3 months watch PH Latina: Receipt of Exolgan Project has impact of DM 15.2m on revenue and DM 0.8m on operative res
文档评论(0)