- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
【DOC】-道路桥梁工程专业外文翻译--高等级公路沥青路面预防性养护-桥梁设计
英文文献
Highway asphalt pavement Preventive Maintenance
Abstract: The high-grade highway asphalt pavement and damaged the various early stage disease, the type of damage and its causes, and made a crack repair, slurry seal asphalt pavement, such as preventive conservation technology. Key words: asphalt pavement; conservation asphalt pavement and the type of damage causes type of damage The asphalt pavement damage can be divided into: crack category, loose category, class and other types of deformation of the four major categories Causes (1) horizontal cracks in this relatively common disease, mainly due to contraction of asphalt surface temperature and semi-rigid or temperature shrinkage of the shrinkage caused. Roadbed degree of compaction less than this will lead to disease (2) vertical cracks in most cases took place in a half filled or half-dug embankment road widening, mainly from the roadbed caused by uneven settlement. (3) cracking along its initial shape is round with a single trace or more of parallel vertical joints, gradually appeared in the horizontal or vertical Feng Jian oblique connection joints cracking form. Mainly due to lack of structural strength from the road (4) along the road to track performance with a horizontal height difference, mainly because of foot-graded asphalt mixture design unreasonable. Poor or because of the stability of the grass-roots level and degree of compaction of the lack of construction so that the wheel tracks with the material and layer and grass-roots role in the traffic load has repeatedly appeared in the consolidation of lateral shear deformation and displacement caused. In addition, the overloading of heavy vehicles and also produce too many of the important reasons for rutting (5) is the main reason for the wave of road construction material design unreasonable or of poor quality, the road leading to insufficient material level of resistance Mou round of the role: Zongpo paragraph, because the high
文档评论(0)