新建地铁隧道下穿既有站技术的探讨

新建地铁隧道下穿既有站技术的探讨       摘要:本文以安德里北街站~鼓楼大街站暗挖下穿既有地铁为实例,安德里北街站~鼓楼大街站下穿地铁加固区至二号线鼓楼站东南风亭,向北依次下穿二号线鼓楼站主体、护城河及民房区,至安德路交叉口折向东北进入中轴路鼓楼外大街施工得到了有效的控制,确保了施工安全和既有地铁的正常运营。   关键词:隧道, 下穿 , 控制   Abstract: this article with the north street station ~ the drum Andrea street station under the existing metro underground wear, for example, a north street station ~ the drum Andrea street stand reinforced area to wear metro line 2 at the southeast to the pavilion stood the drum, and in turn to the north in line 2 at the drum under standing subject, moat and private housing area, to AnDeLu intersection bends to t