盖梁悬空无支架施工的方案

盖梁悬空无支架施工的方案   摘要:在高速公路桥梁施工中,盖梁高度不高,采用满堂支架施工盖梁耗时长、占用大量钢管扣件等周转材料、不经济,盖梁采用无支架施工能有效的解决该问题,本文使用梁家坝大桥将盖梁无支架施工做简单力学验算。   关键词:高速公路,桥梁,支架   Abstract: in the highway bridge construction, capping beam height not high, the capping beam down the stents construction time-consuming, take up a large turnover materials such as steel buckles, not economic, cover beams without stents construction can effective to solve the problem, this paper used LiangGuBa bridge will cover the beam without stents construction do simple mechanical checked.   Keywords: highway, Bridges, stent         中图分类号:U412.36+6 文献标