常见的康普综合布线方案.pptVIP

  • 53
  • 0
  • 约4.71万字
  • 约 90页
  • 2018-11-03 发布于山东
  • 举报
常见的康普综合布线方案

* * * * * * * * * * * * We have discussed the new significantly shorter cable and cord length requirements and how we used MDM and other technology to get there. Let’s now take a look at what these new shorter requirements mean to customers when deploying a 6A infrastructure. Here we are showing two common LAN architectures. The first is a 4 connector channel with a cross connect, a consolidation point and an information outlet in the work area. With our shorter cable and cord requirements, customers can now build 4 connector channels as short as 14m as seen here – shorter than the cable

文档评论(0)

1亿VIP精品文档

相关文档