- 6
- 0
- 约1.99万字
- 约 11页
- 2018-11-16 发布于福建
- 举报
Portable Energy Efficient
Data Centre Solution
Workspace Technology Limited
Technology House, PO BOX 11578, Sutton Coldfield West Midlands B72 1ZB
Telephone: 0121 354 4894 Facsimile: 0121 354 6447
email: sales@
Portable Energy Efficient
Data Centre Solution
As part of Workspace Technologys Server Room and Data
Centre Services we have developed a unique range of energy
efficient portable “server ready” data centre solutions.
Network Critical Physical Infrastructure represents a significant
investment for any company. Unlike traditional bricks and
mortar or modular systems where relocation is not possible,
Workspace Technologys industry leading Mobile Data Centre
allows for total portability.
The Mobile Data Centre is designed for those businesses that
require the flexibility to relocate server room facilities.
The system also provides a cost effective way to easily expand
existing data centre capacity and to provide both business
continuity and disaster recovery solutions.
Application Summary
■ Disaster Recovery and Business Continuity
■ Cost Effective Data Centre Expansion
■ Mobile Data Centre and Server Room Facilities
■ Media and Event Based Applications
■ Excellent alternative to bricks and mortar builds
■ Internet, Mobile and Telecoms Service providers for local
POP systems.
Mobile Data Centre -
Key Features
■ “Server Ready” - pre-engineered and wired ready for instant
deployment of servers
■ Self contained system complete with cabinets, cooling, UPS
and power distribution
■ Based on Workspace Technologys “EcoDesign” principles, to
您可能关注的文档
- [Goldman Sachs] Speculators, Index Investors, and Commodity Prices英文版本.pdf
- 10 Ideas for the Next 10 Years英文版本.pdf
- 04567924英文版本.pdf
- A comparative study of three boundary element approaches to transient dynamic crack problems英文版本.pdf
- A comparative study on three boundary element method approaches to problems in elastodynamics英文版本.pdf
- A Carrier-Based Unbalanced PWM Method英文版本.pdf
- A Dearth of Exit Strategies英文版本.pdf
- A Novel RPV (Reactive-Power-Variation)英文版本.pdf
- A Noniterative Optimized Algorithm for Shunt英文版本.pdf
- a rose for emily英文版本.pdf
最近下载
- ISO∕IEC 42001-2023人工智能管理体系之2:“4 组织环境-4.2 理解相关方的需求和期望”解读、实施流程和风险描述(雷泽佳编制-2024).pdf VIP
- 节假日加班安全管理规定.docx VIP
- 第四章船体结构节点图.ppt.ppt VIP
- 社区卫生服务站(诊所)门诊病历(A4打印版).docx VIP
- 船体结构节点图.pptx VIP
- 预包装食品标签通则.pdf VIP
- 船体结构第一节船用钢材及连接方法略第二节船体结构第三节船体.ppt VIP
- 餐饮企业餐厅开业筹备推进表.xls VIP
- ISO∕IEC 42001-2023人工智能管理体系之1:“4 组织环境-4.1 理解组织及其环境”解读、实施流程和风险描述(雷泽佳编制-2024).pdf VIP
- 电路(一)试题 - 上海大学.doc VIP
原创力文档

文档评论(0)