Abstract
the actual circumstance, disconnect from the system optimization theory, puts forward
the model of economic operation inside the plant to hydropower station and the
coupling of the joint optimization scheduling model of cascade hydropower stations
in thoughts, inside and outside the integrated scheduling model of cascade num power
plant is established, and modeling steps were introduced in detail, the model can
realize the gl