网站大量收购闲置独家精品文档,联系QQ:2885784924

大跨度管桁架屋盖体系施工过程模拟分析-建筑与土木工程专业论文.docx

大跨度管桁架屋盖体系施工过程模拟分析-建筑与土木工程专业论文.docx

  1. 1、本文档共57页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大跨度管桁架屋盖体系施工过程模拟分析-建筑与土木工程专业论文

Abstract The visual effect of pipe truss structure that has been used gradually in the foyer, airport, gymnasium, exhibition center and other large buildings in recent years is concise and fluent, and the modeling is rich. But it shows a number of mechanical and technical problems in construction. At present, the computer simulation technology is usually used to the analyze and optimize the construction process of this structure. According to the analysis results of the computer software, we can make the appropriate reinforcement or transformation, thus ensuring the construction quality in the premise of economic security. Based on researches of the pipe truss structure, the key construction technology of the pipe truss roof engineering of Jian gymnasium was researched in this paper: Through simulation for the lifting and turning process of the main truss, this paper analyzed the characteristic of the stress changes of the steel truss in the lifting and turning process. The truss member stress which decreases with the truss be straighten up constantly is larger in the initial state of the lifting (0o). After the truss is lifted off the ground completely, the stress ratio of the truss member is generally small and distributed evenly. The calculation results show that the lifting point was reasonable, and the lifting solutions are safe and reliable. By using the nonlinear static analysis of the SAP2000, this paper simulated and analyzed the installation process for the pipe truss roof structure. According to the forming process of practical engineering, roof construction process are divided into 26 stages. The change rule of the internal stress and displacement of structure and member are simulated during each construction stage. The internal stress do not exceed the limits in the construction process, and find out weaknesses to be strengthened to ensure the safety of structural system and the accuracy of subsequent installation. The paper presents t

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档