船舶制造车间作业管理系统设计与实现-计算机科学与技术专业论文.docx

船舶制造车间作业管理系统设计与实现-计算机科学与技术专业论文.docx

  1. 1、本文档共61页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
船舶制造车间作业管理系统设计与实现-计算机科学与技术专业论文

哈尔滨工业大学工学硕士学位论文 哈尔滨工业大学工学硕士学位论文 - - II - Abstract Workshop is the manufacturing department of a shipbuilding enterprise. The job- shop planning and schedule, data collection measure and statistical analysis technique of workshop determine the shipyards production efficiency, cost and decision. How better to achieve continuous operation, shorten the construction period and to adapt to the changes of steel prices, labor costs, labor shortage, has become the issues of common concern in Chinas shipbuilding enterprises workshop management. This paper mainly to do the following based on the problems and features of modern shipbuilding enterprises: By analysis, we obtained a ship building business processes. On the basis of the production characteristics and production mode of modern shipbuilding, we try to get a comprehensive, detailed ship construction business processes. The scheduling model and algorithm for shipbuilding enterprise workshop is established. In the process of analysis and design, we unified the business documents in to standardized data which can be stored. By making the job shop task as the centre, we describe the operation information shipbuilding workshop with the resources, time, workload and other attributes for the task. We designed a set of job shop scheduling system. We classify the job shop scheduling layer into order, level of planning system by department and program area. This paper establishes the scheduling model and algorithm for shipbuilding enterprise workshop. We analyze both of the common shipbuilding workshop of conveyer system and the workshop of tact system. Especially for existence features with the workshop of tact system of the composite type of craft, this paper attempts to balance the workload of each craft, and give full capacity to each craft by using a kind of improved ant colony algorithm. Combination of the above work, we design and implement a management system by referencing the model of modern shipbuilding. This system

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档