网站大量收购独家精品文档,联系QQ:2885784924

典型城市污水处理厂提标改造分析-建筑与土木工程专业论文.docx

典型城市污水处理厂提标改造分析-建筑与土木工程专业论文.docx

  1. 1、本文档共56页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
典型城市污水处理厂提标改造分析-建筑与土木工程专业论文

西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 Analysis in Upgrading and Reconstruction of Typical Municipal Wastewater Treatment Plant Specialty: Architecture and Civil Engineering Author: Liu dazhong Advisor: Zhang jianfeng A.Prof. ABSTRACT Water is the most important resource of human survival. However, with the development of our economy and more and more people, the aggravation of water pollution, the contradiction between water and people become more prominent, how to make better use and protect the water resource has become one of the problems that we need to address. Urban sewage treatment plant as the most important facility of sewage treatmen more and more get the attention of people. Give full play of the role of the sewage treatment plant can release the pressure of the water environment, achieve sustainable development of resource and environment. Luoyang jianxi sewage treatment plant was built in 1998, one of the earlier and large treatment plant in Henan province, treatment of water is 200,000 cubic meter/day, using of A2/O process, output water being designed can reach to the B in first grade standard. After years of running, obvious changes have taken place in wastewater quality, and the effluent water quality can not meet the latest standards, according to the relevant national laws and regulations, some measures must be taken to upgrade to meet the A in first grade standard. Thesis comparative analysis the process used in the waster treatment at home and abroad firstly, and introduce the process used in the wastewater treatment plant of Jianxi Luoyang,points out the present problems of the sewage treatment plant. Through analysis of current input and output water quality,draw a conclusion that the output water quality can not reach to the A in first grade standard. Upgrading is focused on using advanced treatment to improve the removal rate of SS、TN and TP, and modify the biological treatment process,to ensure the effluent water quali

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档