地源热泵相变地板采暖可行性和影响因素分析.docVIP

  • 0
  • 0
  • 约7.27千字
  • 约 6页
  • 2018-12-11 发布于湖北
  • 举报

地源热泵相变地板采暖可行性和影响因素分析.doc

地源热泵相变地板采暖可行性及影响因素分析 河北工程大学 康利改 王景刚 刘杰 摘要:基于建设资源节约型、环境友好型社会在工业化、现代化发展战略中的突出位置,本文对地源热泵相变蓄能地板辐射采暖技术与其它供暖方式进行了比较,指出此系统的优点;还将低温热水与电热源两种方式从火用效益方面论证地源热泵低温热水提供热量的可行性,从而构思出一套以生态理念构建的新型能源系统——地源热泵相变蓄能地板辐射采暖系统,并阐述了该系统的结构、工作原理,分析了供水温度、相变温度与相变半径、相变材料的填充量以及盘管间距各因素的影响,指出在注重环保、节能减排、大力开展需求侧管理和调节峰谷电价比的环境下,其推广应用更具竞争力和社会效益。 关键词:地源热泵 相变材料 地板辐射 影响因素 可行性分析 HYPERLINK /dict_result.aspx?r=1t=feasibility+analysissearchword=%e5%8f%af%e8%a1%8c%e6%80%a7%e5%88%86%e6%9e%90 Feasibility and influencing factors analysis of GSHP radiant floor heating with PCM Hebei university of engineering Wang Jinggang Kang Ligai Liu Jie Abstract: Based on the prominent position of the construction about resource conservation and the environmental-friendly society in the industrialization and modernization developmental strategy, this paper through the comparison of the GSHP radiant floor heating system with PCM and other heating modes, carried out that the heating way with low temperature water has many advantages. Besides the floor radiant heating system with low water and electricity were also compared from the exergy consumption in this paper, then demonstrated that the radiant floor heating with low temperature water is the optimum. On the construction of ecological idea we conceived a new energy system——GSHP radiant floor heating system with PCM energy storage. Also the paper had elaborated the HYPERLINK /dict_result.aspx?r=1t=structure+compositionsearchword=%e7%bb%93%e6%9e%84%e7%bb%84%e6%88%90 structure composition and work way of this system, analyzed the influences of water supply temperature, HYPERLINK /dict_result.aspx?r=1t=phase+transition+temperaturesearchword=%e7%9b%b8%e5%8f%98%e6%b8%a9%e5%ba%a6 phase transition temperature and HYPERLINK /dict_result.aspx?r=1t=phase+change+radiussearchword=%e7%9b%b8%e5%8f%98%e5%8d%8a%e5%be%84 phase change radius, HYPERLINK /dict_result.aspx?r=1t=filling+amountsearchword=%e5%a1%ab%e5%85%85%e9%87%8f filling amount of PCM and coiled pipe spacing。At last we

文档评论(0)

1亿VIP精品文档

相关文档