河床下切引起的桩柱式桥墩病害加固研究-建筑与土木工程专业论文.docxVIP

河床下切引起的桩柱式桥墩病害加固研究-建筑与土木工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
河床下切引起的桩柱式桥墩病害加固研究-建筑与土木工程专业论文

华 华 中 科 技 大 学 硕 士 学 位 论 文 II万方数据 II 万方数据 Abstract With the riverbed undercutting occurring frequently, which lead to bridge collapse accidents, the research on reinforcement of bridge diseases catched more and more peoples attention. In this paper, as the current lack of the reinforcement research direction and research work of the diseases caused by the riverbed undercutting, the methods of reinforcement of Pile-Column pier diseases under riverbed undercutting and the reinforcement parameters optimizations aspects were studied on the basis of actual projects. Research works in this paper are summarized as follows: This paper summed up the Pile-Column pier common diseases under riverbed undercutting and commonly used reinforcement methods on the basis of actual projects which are reinforced by our research group in recent years. This paper also analyzed the cause of the diseases and expounded the definition of Pile-Column pier s loss of stability under riverbed undercutting and several main influencing factors. Combining with practical engineering, the article discussed the reinforcement measures and the reinforcement mechanism for the methods of reinforcement and reconstruction which are proposed and adopted by our research group, and used Midas Civil software to make numerical analysis for before riverbed undercutting, riverbed undercutting before reinforcement, after reinforcement and long-term riverbed undercutting four state to prove the reliability and and the effective of the reinforcement method after a period of time. Using the control variable methods, selected points horizontal displacement on the bridge pier as optimization index while other factors are under the same conditions. comparing the analysis and calculation results from the computing model, summed up the reasonable strengthening piles diameter and piles spacing, and puted forward the methods PAGE IV万方数据 PAGE IV 万方数据 to control the horizontal displacement of Pile-Column pier. Keywords:riv

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档