高寒地区高压输电杆塔热桩基础研究-岩土工程专业论文.docxVIP

高寒地区高压输电杆塔热桩基础研究-岩土工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高寒地区高压输电杆塔热桩基础研究-岩土工程专业论文

哈尔滨工业大学工学硕士学位论文 哈尔滨工业大学工学硕士学位论文 - - II - Abstract So far, there hadn’t been interiorly any systemic test research or numerical calculation on combination of the bearing capacity of the foundation of the transmission tower with the preservation of the frozen state of the frozen soil in the permafrost region. The direct-current (±500kV) transmission project, from Hu Lun Bei Er to Liao Ning Province, was across the permafrost region, so it was very significant and practical to study the design method to ensure the construction period, the security and the regular service of the project. To satisfy the requirement of the project, the new-model thermosyphon foundation was applied, and the thermosyphon was wrapped with concrete, so this special foundation can not only bear the load from superstructure, but also preserve the permafrost soil from thawing. The main investigation contents: According to the conditions of the permafrost region and considering the global warming, firstly, the thermal and mechanical finite element model of the thermal pipe foundation was established with the function of the thermal and nonlinear mechanical analysis of ANSYS, and then the distribution comparison between temperature fields of the thermosyphon foundation and the normal pole foundation was obtained in the permafrost region. The thermal calculation results indicated that the frozen table rose with 0.5m, and the inner temperature lowered with 2℃, in comparison with those with the normal pole foundation in the same permafrost site, which can prove the distinct permafrost-preserved effect of thermal pipes. In response to the distribution of the temperature fields of ten years in the permafrost region, it was concluded that the permafrost-preserved effect of thermal pipes was in direct ratio to the ages that they had worked for in the project. With the increase of the area-ratio and the length of the thermosyphon, a better cooling effect was obtained on the ground base; when the spacing b

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档