PPT创意设计方案 201491 - Indico [Home].pptVIP

  • 5
  • 0
  • 约9.43千字
  • 约 25页
  • 2018-12-15 发布于山西
  • 举报
* * 2007 The conception of XTP was put forward by IHEP; 2008-2012 An advanced research of the XTP was carried out by ISSE; 2013-2014 Completed the system analysis and achieved the mission’s basic parameters . The first step design of the XTP was finished; 2015-2016 With the LAD and WFM adding into the XTP and the parameters of SFAPFA has changed,redesigned the eXTP satellite; 2017 New launch vehicle; new orbit;new payload;So we update the design of the eXTP satellite. 2. Design Evolution 3. Basic Parameters Orbit 550km,0 deg Launch vehicle LM-7 Launch site W

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档