基于bim的变截面桥体可视化施工技术应用研究-土木工程专业论文.docxVIP

基于bim的变截面桥体可视化施工技术应用研究-土木工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基于bim的变截面桥体可视化施工技术应用研究-土木工程专业论文

万方数据 万方数据 Abstract In recent years, construction industry has enjoyed a robust development following China’s increasing efforts in capital construction investments. However, the intensive-management of construction industry has presented growing problems, such as execution inefficiency, lag in technology, etc. The emerging technology of Building Information Modeling has brought increasing improvements and commanded much attention around construction industry, moreover, enormous value has been developed. At present, BIM technology, based on its high degree of visualization and information integration, is widely applied in constructional engineering as a result of its enhancement in efficiency of construction. Bridge engineering, as a significant branch of civil construction, has been confronted with growingly greater challenges in construction supervision. Aimed at generalizing the use of BIM technology in construction of bridge engineering, this article, by analogy of BIM technology’s application in execution of constructional engineering and in combination of its basic theory, masterly applies Autodesk Revit software to BIM of bridge engineering by reference of a bridge of complicated structure and variable cross-section. Modeling of over-all structure of variable cross-section bridge, specific construction condition and work site layout have been accomplished through model families of structural component and provisional component model families of construction. An exploratory study on application of BIM technology to the bridge construction process was conducted through the analysis and handle of such variable cross-section bridge. At last, a construction schedule was modeled in 4D for this variable cross-section bridge, using Navisworks on basis of BIM 3D model, and the process of the 4D construction schedule of bridge construction was studied by simulating the schedule of the bridge construction and key construction work. A pilot exploratory study was made on t

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档