2010年第1 1期 煤 炭 工 程
综采工作面液压支架组装流程程序优化分析
于 洪,刘世峰,王中州
(河南煤化焦煤集团赵面一矿,河南新乡 453034)
摘 要:为了解决综采工作面液压支架在井下组装困难的问题,运用工业工程的流程程序分
析方法对支架组装流程进行了优化,采取 “5W1H”对加工、检验、搬运、储存、等待五项活动
进行提问和思考,找出原有组装流程存在的问题,运用ECRS的原则对流程进行优化改进。实践
表明:优化后的组装流程大大提高了支架组装效率,保证了综采工作面安装的顺利完成,从而保
证了工作面的正常接替。
关键词:综采;支架组装;流程优化;工业工程
中图分类号:TD一05 文献标识码:B 文章编号:1671—0959(2OLO)1l-0059-04
Analysis on optimization of assembling process program for hydraulic
powered support applied in fully mechanized coal mining face
YU Hong,LIU Shi—feng,WANG Zhong—zhou
(Zhaogu No.1 Mine,Henan Coal Chemistry and Coking Coal Group,Xinxiang 453034,China)
Abstract:In order to solve the assembling difficult problem of the hydraulic powered supports in the underground mine for
the fully mechanized coal mining face,the industrial engineering process program analysis method was applied to the
optimization of the powered support assembling process.The“5W1 H’’was applied to consider and put questions to the
processing,inspection,handling,storage and standby activities in order to seek the existing problems of the previous
assembling process and to optimize and improve the process with the ECRS principle.The practices showed that the
assembling process optimized could highly improve the assembling rate of the powered support and ensure the successful
equipment installation completed of the fully mechanized coal mining face.Therefore the regular replacement of the coal
mining face could be ensured.
Keywords:fully mechanized coal mining;assembling of hydraulic powered support;process optimization
工业工程是综合应用工业专门知识和系统工程的原理和 究对象所处的层次不同,可以分为三类,即程序分析、操
方法,通过规划、设计、评价和创新活动,将生产过程中的