网站大量收购独家精品文档,联系QQ:2885784924

谈后浇带的设计说与施工.docVIP

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
谈后浇带的设计说与施工

谈后浇带的设计与施工 Abstract: the new release of code for design of concrete structures (GB 50010-2002, hereinafter referred to as the concrete specification), the reinforced concrete structure of the largest joint spacing requirements than the strict norms, norms used by the word may should be changed to . This requires in the structural design, the designer must be taken seriously due to long to structure the negative influence, when the distance increases or structural joints is no expansion joint, must take practical measures to prevent the cracks of the structure. Key words: post pouring belt; design; construction The new release of code for design of concrete structures (GB 50010-2002, hereinafter referred to as the concrete specification), the reinforced concrete structure of the largest joint spacing requirements than the strict norms, norms used by the word may should be changed to . This requires in the structural design, the designer must be taken seriously due to long to structure the negative influence, when the distance increases or structural joints is no expansion joint, must take practical measures to prevent the cracks of the structure. In increasing the spacing of the largest joint measures, take prevention measures in construction stage is an effective method for the general concrete shrinkage reducing the adverse effects of our common approach is to set the construction of the pouring belt. In addition, when the building there is a big difference, but the structure design according to the specific circumstances can not set up permanent deformation joints, such as high-level and multi-storey main building (or lower) between the podium, construction is often used after pouring to resolve the differences in the construction phase of the settlement. These two kinds of construction after pouring belt, the former can be called shrinkage after pouring belt, the latter can be called post settlement belt. In this paper, after the construction of the design and co

文档评论(0)

189****6821 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档