Test Report for the Second 2m Cube Trial
1.The Purpose of the Second trail Pour of Bigger Samples
For the proposed new mix ratio, monitor the temperature cha Samples nge, internal strain, surface appearance and crack development, verify the efficiency of the new temperature control measures , curing methods and basic performances of concrete; Then compare the results of the second trial block with the first one to obtain better methods for concrete casting.
2.Comparison for the 2 trial blocks
Table 1 comparison for the 2 trial blocks
The 1st trial block
The 2nd trial block
Mix ratio
配合比
Slump
塌落度
Leaving plant: 150mm
Slump
Leaving plant: 120mm
Before placing: 90mm
Before placing: 80mm
Temperature before placing
27
Temperature before placing
29
Setting time
凝固时间
Initial setting: 6hrs 初凝
Setting time
Initial setting: 18 hrs
Final setting time: 7.5 hrs
Final setting time: 20hrs:
Mechanical properties of the concrete
砼机戒性能
Compressive strength for 3 days: 37MPa
Compressive strength for 3 days: 31.5MPa
Tensile strength for 3 days: 3.18N/mm2
Tensile strength for 3 days: 2.53N/mm2
Elastic module for 3 days: 23250N/mm2
Elastic module for 3 days: 12200N/mm2
Results of temperature and strain
Temperature
Maximum temperature: 71
Temperature
Maximum temperature:
72
Maximum concrete temperature difference: 41
Maximum concrete temperature difference: 25
Strain
Central point for 3 days: 96.82
Strain
Central point for 3 days : 126.54
Curing
Covered with thin sacks, and polythene. Removing the polythene when pouring water.
Covered with 3 layers of geotextile, and covered with polythene for all day. Did not remove the polythene when pouring water with dripper pipe feeding water. The temperature of the curing water was controlled at 35±5℃
Plum
No P
Place 3 layers of plum, which occupy 6% of the total volume of the concrete
Admixture
CF100: 5.3 L/m3 (1.8% of the cement by weight)
CP305:1.1 L/m3 (0.36% of the cement by weight)
SP435: 5.4 L/m3
RP264: 0.77 Kg/m3
3.The Par
您可能关注的文档
- 2017年天津美术学院服装染织设计系考试科目,考研参考书,考研真题.pdf
- 2017年天津美术学院视觉艺术设计系考研考试科目,考研参考书,考研真题.pdf
- 2017人大金融专硕考研经验报录比招生人数考研经验.pdf
- 2018美国留学热门专业美国化学专业大学排名一览表.docx
- 2018美国留学热门专业美国物流供应链管理专业解析.docx
- 20092010学年人教新课标版湖南省湘潭市西河中学七年级生物上学期期末模拟考试卷1.pdf
- 20112012年八年级生物上册期中测试卷无答案 苏科版.pdf
- 20122013年贵州安顺市燃气行业可行性研究报告.doc
- 20132014学年高中数学 721直线的一般方程课件 湘教版必修3.pdf
- AlphaGo的成功是蒙特卡洛树搜索加深度学习的胜利光环大数据培训.pdf
- 2-红河州建筑施工安全生产标准化工地复核评分表(2022年修改版).docx
- 6.锡通项目2018年下半年工作会汇报材料(2018.7.9).docx
- 2018道路工程知识点汇总(新版).docx
- 附件3:月度生产例会安全汇报资料-站台门项目部.docx
- 附件2:广东建工集团2018年度科技成果汇总表.DOC
- 马武停车区、三汇停车区停车位管理系统,0#台账缺量.doc
- 攀成钢委办发〔2015〕19号(党风廉政建设责任考核与追究办法).doc
- 1-红河州建筑工程质量管理标准化复核评分表(2022年修改版).docx
- 中交第三公路工程局第四工程分公司项目经济合同结算管理办法(修订).doc
- 厂站安全操作规程汇编.doc
文档评论(0)